MAIN CONTRACTOR:
-
PROJECT NUMBER:
-
QA SHEET NO:
-
ELEVATION/LOCATION:
-
COMMENTS:
-
CARRIER RAILS ARE INSTALLED ALIGNED & LEVEL TO REQUIRED DATUMS.
-
CARRIER RAILS ARE CORRECTLY SEATED & ABUTTING TO ADJACENT CARRIER RAIL.
-
FIXINGS TO CARRIER RAIL ARE CORRECTLY INSTALLED TO TAYLOR MAXWELL DESIGNED FIXING PATTERN.
-
CARRIER RAILS HAVE THE CORRECT BEARING TO THE VERTICAL SUPPORT RAILS.
-
CARRIER RAILS HAVE THE CORRECT AS DESIGNED SUPPORT TO THE CORNERS & ABUTMENTS.
-
CARRIER RAILS HAVE THE CORRECT SPACING GAP TO ALL ABUTMENT DETAILS.
-
CORRECT FIXINGS HAVE BEEN INSTALLED AS PER A2O FIXING SCHEDULE.
-
BRICKSLIPS ARE INSTALLED AS PER A20 DESIGN PACKAGE.
-
BRICKSLIPS ARE CORRECTLY SEATED TO THE CARRIER RAILS.
-
BRICKSLIPS HAVE THE CORRECT PERP SPACING AS PER A2O DRAWING PACKAGE.
-
BRICKSLIPS CUTS ARE STRAIGHT & TO AN ACCEPTABLE QUALITY.
-
BRICKSLIPS HAVE THE CORRECT ALIGNMENT FINISH TO ALL ABUTMENT DETAILS.
-
BRICKSLIP CORNERS ARE INSTALLED WITH NO CRACKS & ARE CORRECTLY ALIGNED.
-
ANY CHIPPED OR DAMAGED BRICKSLIPS HAVE BEEN REPLACED PRIOR TO POINTING.
-
A20 PROJECT MANAGER
-