INSPECTION 01
-
MAIN CONTRACTOR:
-
CONTRACT NUMBER
-
QA SHEET NO:
-
ELEVATION/LEVEL
-
HAVE THE SUPPORT RAILS Z BARS BEEN ADJUSTED CORRECTLY TO THE REQUIRED LENGTH WITH A NEAT BURR FREE CUT.
-
HAVE THE SUPPORT RAILS BEEN INSTALLED TO THE CORRECT ALIGNMENT AND OFFSET TO THE REQUIRED CAVITY VOID AS PER DESIGN PACKAGE.
-
HAVE THE SUPPORT RAIL FIXINGS BEEN INSTALLED TO THE FIXED POINT LOCATION AS PER THE DESIGN PACKAGE.
-
HAVE THE CORIUM RAILS BEEN INSTALLED TO THE CORRECT LOCATION AS PER THE DESIGN PACKAGE.
-
HAVE THE CORIUM RAILS BEEN INSTALLED ALIGNED AND LEVELED ACROSS THE ELEVATION.
-
HAVE THE CORIUM RAIL FIXINGS BEEN INSTALLED TO CORRECT POINT AS PER THE DESIGN PACKAGE
-
HAVE THE CORIUM BRICKSLIPS BEEN INSTALLED CORRECT AS PER THE DESIGN PACKAGE
-
HAVE THE CORIUM BRICKSLIPS CUTTS BEEN INSTALLED CORRECT AS PER THE DESIGN PACKAGE
-
POINTING IS CORRECTLY APPLIED TO ALL HORIZONTAL & VERTICAL JOINTS.
-
POINTING HAS BEEN SUITABLY CLEANED TO FACE OF BRICKSLIP WITH NO RESIDUE STAINING.
-
SILICONE POINTING INSTALLED TO JOINT DETAILS WITH FINISH AS PER AGREED BENCHMARK REQUIREMENTS.