Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Patio door bracket site inspection form

  • Client: Wates construction

  • Job title: Wembley Park NW07 NW08

  • MPrice inspection time

  • Location

  • Block or phase

Bracket inspection

  • Brackets fixed to datum?

  • Brackets level?

  • Brackets dirt free and damage free?

Fixings

  • Are the correct fixings used?

  • Are the correct number or fixings used?

  • Is the fixing embedment correct?

  • Is the fixing torque correct?

Photo

  • Photos of any relevant drawings

  • Photo of fixed brackets

Signatures

  • MPrice QA Manager

End of inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.