Information
-
Site Name:
-
Conducted on
BTS Dampers/ Dampers Control Unit Maintenance Certificate
Customer overview
-
Job Number:
-
Site Name:
-
PPM number:
System Overview
-
Variations from the recommendations of Clause 45 of BS5839-1:2013 for periodic or annual inspection and test (as applicable).
-
Maintenance Visits quarter number:
Functional Equipment Testing:
-
Has the control equipment/ damper/s been tested
-
Are all controls and visual indicators at panel OK?
- Yes
- No
- N/A
-
Are all ancillary functions of the panel OK?
- Yes
- No
- N/A
-
Please state below Details of Work completed/Comments & Additional work undertaken
-
Any other issues conditions also with the installation additions or rectifications required
Engineers' Time Sheet a Summary:
-
Enter Date of testing
Customer Acceptance:
-
Engineers Name on behalf of BTS:
-
BTS Engineer's Signature:
-
Customer Acknowledgement (INPUT NAME): I confirm the satisfactory completion of the above maintenance visit.
-
Customer Job Title:
-
Customer Signature:
Office use ONLY:
-
Closed:
-
Invoiced (where applicable):
-
Actioned by:
-
Date Closed:
BTS Company Details:
-
Building Technology Services 119a Derby Street Burton-on-Trent DE14 2LE Tel:01283 566 977 Email: service@buildingtechnologyservices.co.uk
-
Document Reference Number QD53c, Rev 3, June 2014