Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PRE -ARRIVAL PREPARATIONS.
-
1/Are personnel carrying out the task competent and fit for duty
-
2/ Is all required tooling and equipment to carry out the installation of anchors at hand
-
3/ Are electrical tools test tagged and ready for use
-
4/ SWMS read and signed by all workers involved
-
5/ Drill locations marked out
-
6/ Has the concrete been scanned for steel or electrical cabling
-
7/ Has an exclusion zone been created and enforced
-
8/ Product safety data and instructions for use are on hand for the chemical anchors
-
9/ All appropriate PPE is on hand and in good condition
Drilling and fixing
-
1/ has the hole been drilled to the correct depth and diameter?
-
2/ Has the hole been cleared of dust/debris?
-
3/ has the chemical fixing agent been inserted as per the manufacturers guidelines?
-
4/ Has the anchor been inserted correctly to the correct depth
-
5/ Return visit required to ensure anchor has set correctly
-
6/ Pull test or Engineer sign off required prior to using the anchor
-
Has client been notified?