Information
-
Conducted on
-
Project No:
-
Location
-
Foreman
-
Site Contact
-
Company/contractor
-
Prepared by
1. Public Safety
-
1.1 Traffic and pedestrians taken into consideration
-
1.2 Signage is appropriate for scope of works?
-
1.3 Traffic management plan completed, submitted and maintained?
-
1.4 Copy of speed limit form (Memorandum of Authorisation) with foreman/office?
2 Personal Protection Equipment
-
2.1 In good order and being worn?
-
2.2 Hi-vis vest/jacket done up?
-
2.3 Head, eye or ear protection worn?
-
2.4 Safety clothing / footwear adequate?
-
2.5 Sun protection appropriate? Hat, long sleeves, long pants, sunglasses.
3 Plant
-
3.1 In good order?
-
3.2 Reversing signal, flashing lights in working order?
-
3.3 Daily checklist or logbook complete?
4 First Aid Facilities
-
4.1 Kit available and appropriate contents?
-
4.2 Dates within use-by?
-
4.3 Certified first aider on site?
5 Trenching
-
5.1 CoGB trenching procedures complied with?
-
5.2 is soil pile toe at least 0.5m from trench?
-
5.3 Are supports over stressed?
-
5.4 Are tension cracks appearing along the top of the tench?
-
5.5 Are pipes, tools, spoil pile, mobile plant too close to the trench?
-
5.6 Is anyone climbing the toms instead of using a ladder?
-
5.7 Are safety helmets being worn at all times in and around trenches?
-
5.8 Is anyone working alone in a trench?
-
5.9 If trench is more than 1.5m deep has it been stepped out?
-
5.10 Are trenches barricaded from traffic and pedestrians?
-
5.11 Services locations and protection identified (including spotters and any permits required)?
6 Chemicals
-
6.1 MSDS register on site?
-
6.2 Is MSDS register up to date?
-
6.3 Dangerous goods storage appropriate (including fuels)?
7 Other
-
7.1 Are staff amenities appropriate?
-
7.2 Is on site storage available?
-
7.3 Power leads and tools tagged?
-
7.4 Site induction carried out? Including subcontractors?
-
7.5 JSA/SWMS available & completed?
-
7.6 Emergency procedure in place?
-
7.7 Licences and registrations current?
-
7.8 Confined space procedures in place?
-
7.9 Fall from height controls or procedures in place?
-
Comments/Additional safety items:
-
Items requiring attention referred to:
-
For action by:
-
Auditor signature
-
Auditee signature