Title Page
-
Site conducted
-
Conducted on
-
Account used
-
Block / Plot / Phase
Health & Safety
-
Is health & safety on site acceptable? ie Correct PPE being worn, Rams signed ?
Housekeeping
-
Is the site, material storage and our working areas tidy and organised.
Weekly Labour levels
-
Please confirm Labour levels on site inc site management & Labourers
Weekly Weather
-
Please list general weekly weather & any lost days due to bad weather
Site Instructions
-
Have any site instructions / variations or requests been issued
Procurement
-
Are all materials on site
- Vapour Barrier 50%
- Vapour Barrier 100 %
- Insulation 50%
- Insulation 100%
- Membrane 50%
- Membrane 100%
- Cappings 100%
- Membrane components 100 %
Programme
-
Are we on programme?
-
Please confirm reasons for delays to programme
QA Flat Roofing
-
• Has the structural substrate been tested with a full system bond test, to ensure a sufficient bond to the substrate can be achieved, including recording test results.
-
• Has all finishing lines along abutments/detailing been masked of to provide clean finishing lines
-
• Are the finished coatings free from standing glass reinforcement wicks, pin holes or air bubbles
-
• Have all termination metals and profile drip trims been installed correctly and fixed in line with standard requirements
-
• Have we spot check various area to check for any installation defects
-
• Has all perimeter abutments, change in levels/directions been installed as per standard recommendations.
-
• Are there any signs of mechanical damage/unprotected access by other trades over the newly installed waterproofing.
-
• Has the liquid coating been applied to meet the require coverage rates.
-
• Has the waterproofing system been installed in line with the specification and manufacturers standard requirements
Completion
-
Are there any other notes relevant to these works?
-
Sign below
-
Russell Roofing Signature