Title Page

  • Installer Name

  • Address (Map Location - Editable) (IF NO SIGNAL USE NEXT OPTION)
  • Customer Address (USE IF NO SIGNAL FOR MAP)

  • Customer Postcode (Required for Submission Title )

Installation Report Page

  • Roof Pictures (Pre Install)

  • Panel Label Data Sticker (Reverse Of Panel)

  • Panel Array Pictures (Mid Install - Rail, Hooks)

  • Panel Array Pictures (Post Install)

  • Final Quantity Of Installed Panels (i.e 9)

  • Overview Of Installation (Inverter/Batteries/Wiring) (stand back for a clear photo)

  • Inverter Pictures (Including CLEAR Inverter SN)

  • Inverter Screen Showing "NORMAL" Operation (CLEAR PHOTO)

  • Inverter Screen Showing PV1 & PV2 Voltages (CLEAR PHOTO NO FLASH)

  • Datalogger SN Pictures (VERY Close Up & CLEAR)

  • Battery Serial Numbers (1 SN Per Photo)

  • Battery Full Stack Photos

  • Battery Version Sticker i.e V1 / V2 (if applicable)

  • Gen Meter Photo (Overview + CLEAR SN & MODEL)

  • NEW DB / Fuse Box Photos (CLEAR PHOTOS Showing Breaker Rating)

  • MINOR WORKS PHOTOS - Upload Pictures In the FINAL QUESTION of Minor Works

  • Meter & CT Clamp Positioning and Arrow Direction Photos

  • (GivEnergy Meter) (CLEAR Close Ups & Overview)

  • Zappi / Eddi / Harvi Install Photos (Overview & CLEAR SN)

  • Any other photos Relevant to Install (CLEAR PHOTOS) (TP Link Devices etc.)

  • Video For Faults / Issues / For Office Records (i.e Pre-existing damage/ damage caused)

  • Photos For Faults / Issues / For Office Records (i.e Pre-existing damage/ damage caused)

Minor Works & Photos (if not required, move to EIC)

Part 1: Description of Minor Works (if not required, move to EIC)

  • Description of the minor works

  • Location / Address Of Minor Works
  • Date Of Minor Works Completed

  • Details Of Departures, if any, from BS 7671:2008 (as amended):

  • Details of permitted exceptions (Regulation 411.3.3). Where applicable a suitable risk assessment must be attached to this certificate

  • Type:

Part 2: Install Details of Minor Works (if not required, move to EIC)

  • System Type and Earthing Arrangements:

  • Method of Fault Protection

  • Protective Device for the Modified Circuit Type

  • Rating (A)

  • Comments on existing installation, including adequacy of earthing and bonding arrangements (see regulation 132.16 C1, C2 C3)

  • Additional Comments

Part 3: Essential Tests of Minor Works (if not required, move to EIC)

  • Earth Continuity Satisfactory

  • Installation resistance Live - Earth (MΩ)

  • Earth fault loop impedance (Ω)

  • Polarity Satisfactory

  • RCD operation (if applicable). Rated residual operating current (IΔn) mA

  • Disconnected time at IΔn (ms)

  • Disconnected time at 5IΔn (ms)

  • Satisfactory test button operation

Part 4: Declaration of Minor Works (if not required, move to EIC)

  • I CERTIFY that the said works do not impair the safety of the existing installation, that the said works have been designed, constructed, inspected and tested in accordance with BS 7671:2008 (IET Wiring Regulations), amended to (date) and that the said works, to the best of my knowledge and belief, at the time of my inspection, compiled with BS 7671 except as detailed in Part 1 above.

  • Name

  • Address
  • For, and on behalf of: (Company & Customer Name)

  • Customers Signature

  • Engineers Signature

  • Customer Requires Certificate / Report

  • Photographs Of Minor Works Carried Out (CLEAR Photos)

EIC Report (Electrical Installation Condition Report)

  • Photograph of EIC Report (Upload FULL PDF or Upload Pictures)

Customer Satisfaction Survey

  • Project Reference (Postcode)

  • Customer Name

  • Customer Address
  • Installation Type

  • When the installation is Complete, you should have any settings and controls etc, explained to you in a jargon-free manner.

    We should also have met any specific requirements and expectations that we were made aware of.

    If you are in agreement, that the job is complete, and we have met your requirements we would ask that you sign below to confirm this.

    The signing of this form will not limit your statutory rights, nor will it affect any guarantees or warranties.

    If you have any feedback on the installation process or any area of your contact and experience with us, please use the comments section below:

  • Customer Comments

  • Date/Time

  • Customer Full Name & Signature

  • Installer Full Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.