Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Contracts Manager
- Didi Hesed
- Laurynas Pakalnis
- Chris Stander
- Bernard Geldenhuys
- Heinrich Fick
- Jaunius Kvedaras
-
LL Supervisor on site
-
Principal Contractor
-
Copied to
Site Entrance
-
Sign in sheets
-
Required signage
Site Entrance - Safe Access Route
-
Clear
-
Clearly identified
-
Trip hazard free
Canteen
-
Clean and tidy
-
Statutory signage
-
Drinking water
-
Fridge, microwave, kettle
-
Seating
-
Separated from work area
-
Facilities monitoring form
Drying Room
-
Clean and tidy
-
Heating
-
Seating / hooks
-
Privacy
-
Facilities monitoring form
Site toilets
-
Clean and tidy
-
Ladies toilet on site
-
Warm water
-
Supplies (hand soap/paper)
-
Suitable for number of workers
-
Mirror
-
Facilities monitoring form
Site Offices
-
Clean and tidy
-
Statutory signage
-
Tea making area
-
Facilities monitoring form
Loading Bay
-
Clean and tidy
-
Banksman
-
Temp storage area
-
Segregation of people / vehicles and tidy
Contra-charge System
-
Daily C.A.R. notes and pictures
-
Actioned C.A.R.'s (copy to client)
Protection
-
Picture survey before protection
-
Correct choice of material
-
Quality of protection
-
Maintenance
Hoarding
-
Built to specification
-
Hoarding licence displayed
-
Signage
-
Maintenance
Plant and Equipment
-
PAT Testing
-
Maintenance
-
Security of all plant and equippment
Plant and Equipment - At Delivery
-
Correct number of items
-
Checked and recorded any damage
Plant and Equipment - At Return
-
Correct number of items
-
Checked and recorded any damage
-
Issues reported to Contracts Manager
Fire Warden duties
-
Emergency lighting
-
Temp alarm (control/tests)
-
Muster point (clearly identified)
-
Duties in case of emergency
Fire Warden duties - Fire Points
-
Correct location
-
Inspection date within 12 months
-
Bell
-
Weekly fire checks in writing
Fire Warden duties - Fire Exits
-
Clear
-
Signage in place
-
Monitored at least 3 times a day
Fire Warden duties - Smoke Detectors
-
Isolations/Re-instatements
-
Covers
Level of Knowledge
-
Site daily activities
-
Risk management
-
Health & Safety issues
Signage
-
Signs required by law
-
Directional signage
-
Information signage
-
Prohibitive signage
-
Hazard signage
-
Displayed level and clean
-
Up to date
Site Radios
-
Serial number allocated to each person
-
Weekly checks and reports
Site Radios - At delivery
-
Correct number
-
Checked for damage
Site Radios - At return
-
Correct number
-
Checked for damage
-
Issues reported to Contracts Manager
Delivery Management
-
Awareness of Logistics/Fire Plan
-
Booking deliveries
-
Management of deliveries
-
Daily reports produced
Health & Safety actions
-
Cable Management
-
Monitoring temporary power/lighting
-
Client permits
-
Client inductions
-
Yellow/red card system
Materials
-
Storage areas
-
Pallets used
-
Access to materials and work
-
COSHH materials
Waste Management
-
Bins and skips provided
-
Separation of waste
-
C.A.R. system used
-
General rubbish
Hazardous waste
-
Drums provided
-
Separation of waste
-
Correct forms used
-
Certification for removal
LEANER LOGISTICS PROCEDURES AND REQUIREMENTS
Our presentation
-
Hats and Hi-vis
-
Leaner t-shirts & sweatshirts
-
Cleanliness
Pay awareness
-
Basic hours
-
Overtime hours
-
Pay rate
-
Chainbox system
-
PAYE and CIS
-
Info available
Paperwork
-
Chainbox forms/PAYE/CIS
-
Plant requisition forms
-
Expenses
-
LL Delivery notes
-
Waste notes and certs
-
Weekly supervisor's safety audit
Paperwork - Timesheets
-
Problems with timesheets sorted
-
Unsigned timesheets
Paperwork - Allocation Sheets
-
Up to date
-
In detail
-
Issued to client
Paperwork - Hire log and off-hire log
-
Issued to client weekly
-
Cross-checking with hire log from Gap
Paperwork - Training certificates
-
CSCS
-
Other training certs
-
Matrix
-
Matrix corresponds with certs on site
Paperwork - Plant and equipment (LL only)
-
Register
-
Spare key for the office
-
Toolkit number
-
Corresponds with toolkit log
Paperwork - Copies of ID
-
Passport and visas
-
NI Number
Gangers Profile
-
Notebook used at all times
-
CV Picture
-
Reference letters
-
Clients' feedback
-
Ganger responsibility training
-
Health & Safety training (as required)
-
Procedure training
Complaints system
-
Awareness
-
Process
Logistics Manager's actions
-
Reported accidents (copy required)
-
HSEQ plan
-
Actions from previous H&S Audits
-
Actions from previous Logistics audit
-
Valuation meeting with FM and CM
-
Feedback forms from client staff
-
LL contact details (as per contacts list)
-
Completion date
-
Walk-round with Ganger
-
LL Security Procedure
ADDITIONAL COMMENTS
-
Comments:
ISSUES TO BE REPORTED ON SHE ONLINE
-
ISSUE 1
-
ISSUE 2
-
ISSUE 3
-
ISSUE 4
-
ISSUE 5
-
Signature of Auditor:
-
Signature of LL Supervisor on site: