Information

  • Document number

  • Site

  • Direct Control / Council or Contactor

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Safety - Compliance to WHS Implementation & Site Compliance

  • System to be used

  • S1 - Has a risk assessment been undertaken and documented? (Contractor included in EnSite for the Project and Ordered Works or Situation Awareness tool box for Routine Maintenance Works).

  • S2 - Is there documentary evidence that personnel have been inducted into the site specific risks, hazards and agreed controls?

  • S3 Are the required tickets of competencies recorded correctly and available for presentation on site eg general construction induction, WoF ticket, plant operator’s ticket or evidence of operator being deemed competent to operate plant items?

  • S4 - Are SWMS available for the activity being undertaken and the people involved in the activity signed off and or tool boxed in the SWMS?

  • S5 Are all contract personnel attending and contributing to daily tool box meetings? (Is there evidence of documented daily tool box talks with recording of attendees names)?

  • S6 - Is there a first aid officer & stocked first aid kit available?

  • S7 - Is housekeeping on site acceptable, in fire extinguisher and electrical equipment tagged for the current period?

  • S8- Are Safety Data Sheets (SDS) available? Have hazardous substances been identified and a hazardous substance register is on site?

  • S9 - Compliance with personal protective equipment (PPE)

  • S10 - Are daily plant pre-start inspections being complete?

  • S11 - Is heavy vehicle use in accordance with the contractor’s CoR (Speed, Fatigue, Mass, Dimension, Weight) controls?

  • S12 - Is there evidence of Weekly WHS inspections being complete?

Environment - Environmental Requirements & Performance Behaviours

  • System to be used

  • E1 - Has environmental risks been assessed and documented?

  • E2 - Are site specific environmental requirements known by the Contractor's personnel and documented?

  • E3 - Is the limit of works known by site personnel and protections put in place for No Go Zones?

  • E4 - Is housekeeping onsite acceptable, including the installation of effective erosion & sedimentation protection measures?

  • E5 - Are erosion & sediment controls checked as required? Are environmental inspections being completed as required?

  • E6 - Are wastes being recorded & managed correctly?

  • E7 - Are fuels and chemicals appropriately bunded?

  • E8 - Is wastewater being managed appropriately?

  • E9 - Is there evidence of equipment been regularly checked for defects? (oil spills,leaks, damaged hoses etc).

  • E10 - Do site personnel know the procedure for reporting of environmental incidents?

  • E11 - Is there a spill kit on site and have all personnel been trained in spill management?

Quality - Quality Requirements & Performance Behaviours

  • System to be used

  • Q1 - Does the contractor understand the requirements of the Specifications for the activity that they have been engaged to undertake?

  • Q2 - Are inspection and test plans being used and followed (MAP, Work Method Statement or Technical Procedure)?

  • Q3 - Is the inspection and status known ( including witness points and hold points submitted and signed off)?

  • Q4 - Are incoming products checked for compliance?

  • Q5 - Are work quantities recorded accurately?

  • Q6 - Has testing and survey been undertaken?

  • Q7 - Is rectification documented & work undertaken to achieve conformance?

  • Q8 - Are non conformances / nonconforming products identified and documented?

  • Q9 - Is a lot numbering system being used?

  • Q10 - Is monitoring & measuring equipment maintained and calibrated?

Traffic - Traffic Management Requirements & Performance

  • System to be used

  • T1 - Has a Traffic Control at work sites location Checklist been complete?

  • T2 - Is a standard TCP being used? …. (If Non- Standard TCP see T3)

  • If Yes what is the TCP No:

  • T3 - Has a site specific TCP been approved correctly and appropriate for the site conditions?

  • T4 - Has a VMP been approved and appropriate for the site?

  • T5 - Has a WoF plan been developed that is appropriate to to activity & has it been communicated to site personnel?

  • T6 - Are the needs of pedestrians and cyclists through the works considered?

  • T7 - Are Traffic control inspections records being completed accurately?

  • T8 - Are signs and devices clean, well maintained and installed in accordance with the TCP?

  • T9 - If required, is the ROL & SZA/DTR documentation in place with records kept? Are the requirements of the ROL known and being met?

  • T10 - Is there evidence that signs are covered when not in use? E.g. contradictory signs covered

  • Comments, Further Corrective Action :

Sign Off

  • Site Representative Name

  • Site Representative Signature

  • Surveillane Officers Name

  • Surveillance Officers Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.