Information
-
Inspection . G22 - Work Health and Safety (Tabulam Bridge) Ed 5 / Rev 4 .
-
Project Name: Tabulam New Bridge.
-
Document No.
-
Location: BRUXNER HIGHWAY TABULAM
-
Prepared by
-
Contractor
-
Conducted on
Work Activity Record
1. Health and Safety Systems.
-
1.1 WHS policy displayed.
-
1.2 Accident report book.
-
1.3 Induction records.
-
1.4 Injury management policy available.
-
1.5 Workplace inspection records.
-
1.6 Emergency procedures in place.
-
1.7 Training records.
-
1.8 Documented safe work procedures.
-
1.9 Protective clothing and equipment records.
-
1.10 Safety Data Sheet (SDS) available.
-
1.11 Health and safety system manual. <br>
-
1.12 Management safety representative appointed. <br>
-
1.13 Contract risk assessment available
-
1.14 Contract site specific health and safety system available.
2. Housekeeping.
-
2.1 Work areas free from rubbish and obstructions.
-
2.2 Clear access and egress in the workplace.
-
2.3 Surfaces safe and suitable.
-
2.4 Free from slip/trip hazards.
-
2.5 Floor openings covered.
-
2.6 Stock/material stored safely.
-
Aisles.
-
2.7 Unobstructed and clearly defined.
-
2.8 Adequate lighting.
-
2.9 Vision at corners.
-
2.10 Wide enough.
3. Electrical.
-
3.1 No broken plugs, sockets,switches.<br>
-
3.2 No frayed or defective leads. <br>
-
3.3 Power tools in good condition.
-
3.4 No work near exposed live electrical equipment.
-
3.5 Tools and leads inspected and tagged.<br>
-
3.6 No strained leads.
-
3.7 No cable trip hazards.
-
3.8 Switches/Circuits identified.
-
3.9 Lock out procedures/danger tags in place
-
3.10 Earth leakage system used.
-
3.11 Start/Stop switches clearly identified.
-
3.12 Switchboards secured. <br>
-
3.13 Appropriate fire fighting equipment.
4. Mobile Plant.
-
4.1 Plant and equipment in good condition.
-
4.2 Daily safety inspection procedures/checklists.<br>
-
4.3 Fault reporting/rectification system used.
-
4.4 Operators trained and Licensed. <br>
-
4.5 Warnings and instructions displayed.
-
4.6 Warning lights operational.
-
4.7 Reversing alarm operational.
-
4.8 Satisfactory operating practices.
-
4.9 Fire extinguisher.
-
4.10 Tyres satisfactory.<br>
-
4.11 Safe Working Load (SWL) of lifting or carrying equipment displayed.
-
4.12 Verification of competency sighted.
-
4.13 Trainee log books in use.
-
4.14 Plant keys and unattended plant kept secure.
5. Machinery and workbenches.
-
5.1 Adequate work space. <br>
-
5.2 Clean and tidy.
-
5.3 Free of excess oil and grease
-
5.4 Adequately guarded.
-
5.5 Warnings or instructions displayed.
-
5.6 Emergency stop appropriately placed and clearly identifiable.
-
5.7 Operated safely and correctly.
-
Workbenches
-
5.8 Clear of rubbish.
-
5.9 Tools in a proper place
-
5.10 Duckboards or floor mats provided.
6. Hazardous substances.
-
6.1 Chemical register developed.
-
6.2 Chemicals stored appropriately.
-
6.3 Containers labelled correctly
-
6.4 Adequate ventilation/ exhaust systems.
-
6.5 Protective clothing/ equipment available/used.
-
6.6 Satisfactory personal hygiene practices.
-
6.7 waste disposal procedures.
-
6.8 Safety data sheets available.
-
6.9 Chemical handling procedures followed.
-
6.10 Appropriate Emergency /first aid equipment -shower, eye bath, fire extinguishers.
-
6.11 Hazchem signing displayed.
7. Welding.
-
7.1 Only trained personnel permitted to weld.
-
7.2 Gas bottles securely fixed to trolley.
-
7.3 Welding fumes well ventilated.
-
7.4 Fire Extinguisher near work area.
-
7.5 Only flint guns used to light torch.
-
7.6 Flash back spark arresters fitted.
-
7.7 Vision screens used for electric welding.
-
7.8 Liquefied Petroleum Gas (LPG) bottles within 10 year stamp.
-
7.9 Personal Protective Equipment (PPE) provided and worn.
-
7.10 Hot Work Permit to work system.
8. Excavations
-
8.1 Shoring in place and in sound condition for all trenches more than 1.5m deep.
-
8.2 Excavation well secured.
-
8.3 Signage displayed.
-
8.4 Banks battered correctly and spoil away from the edge.
-
8.5 Sufficient clear areas and safe access around excavation.
-
8.6 Separate access and egress points from excavation.
-
8.7 Safe works procedure in place.
9. Prevention of Falls
-
9.1 All work platforms have secure handrails, guarding or fence panels.
-
9.2 Fall arrest systems maintained and used as required.
-
9.3 Harness and lanyard or belts provided.
-
9.4 All floor penetrations covered or barricaded.
-
9.5 Unsafe areas signposted and fenced.
-
9.6 Safe work procedures in place.
10. Stairs, Steps and landings.
-
10.1 No worn or broken steps, rungs or styles
-
10.2 Handrails in good repair.
-
10.3 Clear of obstructions.
-
10.4 Adequate lighting.
-
10.5 Emergency lighting.
-
10.6 Non-slip treatments/treads in good condition.
-
10.7 Kick plates where required.
-
10.8 Clear of debris or spills.
-
10.9 Used correctly.
11 Ladders
-
11.1 ladders in good condition.
-
11.2 Ladders not used to support planks for working platforms.
-
11.3 Correct angel to structure -1:4
-
11.4 Ladder extends 1 metre above top landing.
-
11.5 Straight or extension ladders securely failed at the top.
-
11.6 Metal ladders not used near live exposed electrical equipment.
12 Scaffolding
-
12.1 Employees trained and records maintained.
-
12.2 Scaffold design complies with AS1576 and is certified.
-
12.3 Safe and suitable access and egress to scaffold.
-
12.4 Handover certificates recorded.
-
12.5 records of inspections maintained.
-
12.6 Repair and maintenance details held on site.
13 Person Protection.
-
13.1 Employees provided with PPE.
-
13.2 Employees trained in the use of PPE.
-
13.3 PPE being worn by employees.
-
13.4 Regular maintenance checks performed on PPE.
-
13.5 Sunscreen and safety glasses provided.
-
13.6 Correct signage at access points.
-
13.7 Hard hat areas correctly sign posted.
-
13.8 Hard hats available for visitors on site.
-
13.9 Hard hats are within the life span set out by AS1800.
14 Safety clothing.
-
14.1 Safety footwear appropriate to the job is worn.
-
14.2 High visibility clothing is worn.
-
14.3 Clothing is in good condition.
15 Manual handling.
-
15.1 Mechanical aids provided and used.
-
15.2 Safe work procedures in place.
-
15.3 Manual handling risk assessment performed.
-
15.4 Manual handling controls implemented.
16. Workplace ergonomics
-
16.1 Work station and seating design acceptable
-
16.2 Ergonomic factors considered in work layout and task design.
-
16.3 Use of excessive force and repetitive
-
16.4 Appropriate training providing.
17. Material handling and storage.
-
17.1 Construction site storage areas established.
-
17.2 Stacks stable.
-
17.3 Heights recorded.
-
17.4 Sufficient space for moving stock.
-
17.5 Material stored in racks/bins.
-
17.6 Shelves free of rubbish.
-
17.7 Access around stacks and racks clear.
-
17.8 Drums checked.
-
17.9 Pallets in good repair.
-
17.10 Heavier items stored low.
-
17.11 No danger of falling objects.
-
17.12 No Sharp edges.
-
17.13 Safe means of accessing high shelves.
-
17.14 Racks clear of lights/sprinklers.
-
17.15 Bunding and containment provided and operational
18. Confined space.
-
18.1 Risk assessment undertaken.
-
18.2 Communication and rescue plan in place.
-
18.3 Safety equipment in good working condition.
-
18.4 Suitable training provided to employees.
-
18.5 Confined space permit used.
-
18.6 All confirmed spaces identified and appropriately signposted.
Lasers and non-destructive testing equipment
-
19.1 Operator has appropriate licence
-
19.2 Signage displayed.
-
19.3 Equipment not used in a manner to endanger other persons.
Compliance and Follow-up action.
-
Is the activity compliant.
-
Surveillance Officer
-
NCPN or memo number.
-
Follow up action
-
Product Non Conformance
-
System Non Conformance
-
Contractor generated NCR
-
Contractor generated a CAR
-
Matters arising
-
NCPN no
-
Contractors NCR no
-
CAR no
-
Closed out.
-
RMS representative's name
20 Demolition
-
Demolition
-
20.1 Risk assessment undertaken in advance.
-
20.2 Access prevented to demolition area.
-
20.3 Overhead protection in place.
-
20.4 Protection of the general public.
-
20.5 safe work procedure in place.
-
20.6 Complies with WorkCover demolition licensing requirements.
21 Public Safety
-
21.1 public protection.
-
21.1 Appropriate barricades, fencing, hoarding and gantry secure and in place.
-
21.2 Signage in place.
-
21.3 Suitable lighting for public access.
-
21.4 Footpaths clean and free from debris.
-
21.5 Dust and noise controls in place.
-
21.6 Site access controlled.
-
21.7 Traffic control procedures in place.
-
21.8 Public complaints actioned.
22 Amenities
-
22 Amenities
-
22.1 Washrooms clean.
-
22.2 Toilets clean
-
22.3 Lockers clean.
-
22.4 Meal rooms clean aand tidy
-
22.5 Rubbish bins available and covered.
-
22.6 Drinking water supplied.
-
22.7 Amenities comply with WHS Regulations.
23 First Aid
-
23 First Aid.
-
23.1 Cabinets and contents clean and orderly.
-
23.2 Stocks meets requirements.
-
23.3 First Aiders names displayed.
-
23.4 First Aiders locations and phone numbers displayed.
-
23.5 Qualified first aider(s)
-
23.6 Record of treatments and of supplies dispensed.
24 Lighting
-
24.1 lighting adequate and free from glare
-
24.2 Lighting clean and efficient.
-
24.3 Windows clean.
-
24.4 No flickering or inoperable lights.
-
24.5 Emergency lighting system installed.
25 Fire Control
-
25.1 Extinguishers in place.
-
25.2 Fire fighting equipment serviced/tagged
-
25.3 Appropriate signing of extinguishers
-
25.4 Extinguishers appropriate to hazard.
-
25.5 Emergency exit signage.
-
25.6 Exit doors easily opened from the inside.
-
25.7 Exit pathways clear of obstruction.
-
25.8 Alarm/communications system is adequate.
-
25.9 Smoking/naked flame restrictions observed.
-
25.10 Minimum quantities of flammables at workstation.
-
25.11 Flammable storage procedures. <br>
-
25.12 Emergency personnel identified and trained.
-
25.13 Emergency procedures documented and issued.
-
25.14 Emergency telephone numbers displayed.
-
25.15 Alarms tested.
-
25.16 Trial evacuations conducted.
-
25.17 Personnel trained in the use of firefighting equipment.