Title Page

  • Date

  • Inspection Title Proof Roll Witness Point.

  • Site Tabulam New Bridge

  • Lot Number

  • Layer Position Below Finished Level.

  • Has the Witness Point been submitted to RMS at least 1 working day prior to proof rolling

  • Witness Point Number

  • Plant used for Proof Roll

  • Surface layer is level, homogeneous, with no large protruding objects or significant surface depressions and free from loose material

  • Contractor has submitted a proof rolling plan outlining the rolling paths and lot locations

  • Proof roll testing carried out immediately upon completion of compaction. If testing delayed more than 12 hours, layer surface must be watered and a minimum of 3 passes completed with the roller to be used prior to testing

  • Roller speed approximately between 3 to 10 KPH

  • Surface deformation is

  • The layer is deemed to be conforming.

  • Principal's Delegated Representative

  • Contractors Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.