Title Page

  • Session

  • Conducted on

  • Prepared by

Untitled Page

Restaurant (Opening Checklist/ 7am - 8am)

  • Switch On Light as per Hotel Standard

    IMG020240910_085202.jpeg.jpg
  • Switch On Lights Accordingly To The Requirements

  • Are the lights turned on at 7AM?

  • Are lights working properly?

  • Coffee Machine arranged as per Hotel Standard

    IMG020240909_095859.jpeg.jpg
  • Are the coffee machine switch on and rinse?

  • Are the coffee machine working properly?

  • Are the tables and chairs set according to the hotel standard?

  • Are the tables and chairs wiped and good condition?

  • Are floors clean, dry and in good condition?

  • How many paxs for breakfast?

Coffee And Tea Station (7am - 8am)

  • Coffee & tea cups arranged according to Hotel Standard

    IMG020240907_164341.jpeg.jpg
  • Is the coffee & tea cups arranged according to our standard?

  • Is the sugar sachet & teaspoon place at buffet counter?

  • Are the coffee and tea place at the buffet counter?

  • Are the hot and cold water out on time?

  • Are the milk serve warm at the counter?

  • Is Orange juice and Mango Juice out on time?

Bread Counter (7.30am - 8.30am)

  • Bread Toaster on as per Hotel Standard

    IMG020240909_095842.jpeg.jpg
  • Is the bread toaster switch ON?

  • Was the white and wholemeal bread out on time?

  • Are the bread served warm or frozen?

  • Are the pastry served warm or frozen?

Porridge/ Fruits / Cereal (7.30am - 8.30am)

  • Porridge condiments arranged as per Hotel Standard

    IMG020240910_085752.jpeg.jpg
  • Is the porridge condiments out on time?

  • How is the taste of porridge?

  • Was the Fruit Platter out on time?

  • Is the presentation of fruit platter is acceptable?

  • Was the Cereal filled up for breakfast?

Salad Counter (7.30am - 8.30am)

  • Salad Counter set up as per Hotel Standard

    IMG020240909_095758.jpeg.jpg
  • Are the salad counter set as per our hotel standard?

  • Is the presentation of Salad Counter is acceptable?

Main Dish Counter (7.30am - 8.30am)

  • Buffet Counter Presentation

    IMG020240907_152511.jpeg.jpg
  • Is the buffet food out on time?

  • Is the presentation of buffet counter is acceptable?

Cashiering (7am - 8am)

  • Ensure that the POS system is working properly?

  • Are the POS system open for breakfast?

  • Are the music switch ON?

Station Plan & Location (7am - 8am)

  • Main Dining Area Set Up as per Hotel Standard

    IMG020240907_164628.jpeg.jpg
  • Main Dining Area

  • Buffet Runner Area Set Up as per Hotel Standard

    IMG020240907_152511.jpeg.jpg
  • Buffet Runner Area

  • Cashier Counter Set Up as per Hotel Standard

    IMG020240907_165043.jpeg.jpg
  • Cashier Counter

Guest Feedbacks (9am - 10am)

Floor Check - Level 1 to Level 4

  • Are the floor check - Room Service (Level 1)

  • Are the floor check - Room Service (Level 2)

  • Are the floor check - Room Service (Level 3)

  • Are the floor check - Room Service (Level 4)

Sign Off (10.30am)

  • Morning Person In-Charge

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.