Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Divisional Director
-
Factory Manager
-
Site Supervisor
-
Completed on
1. QC checks in place and recorded correctly?
-
What is the procedure, mark on drawing or sheet? (Marks out of 10)
2. Pitching reinforcement in place
-
Recorded correctly on drawings? (Marks out of 10)
3. Are Rebar/lifters/sockets cover in at correct levels?
-
What should this be and what is it actually? Any variances checked and approved on new revised drawings by engineer? (Marks out of 10)
4. Any changes to product?
-
Approved by an engineer and revised drawings issued? (Marks out of 10)
5. Quality processes and procedures in place?
-
Internal NCR booklets being used? (Marks out of 10)
6. Trends being identified and measures in place to prevent reoccurrence?
-
(Marks out of 10)
7. Quality toolbox talks and training being carried out?
-
(Marks out of 10)
8. Is there a procedure in place and are these communicated?
-
(Marks out of 10)
9. Have IRs that have been issued from site been closed out to prevent reoccurrence?
-
(Marks out of 10)
10. Does the finish match the agreed sample - acid etch/brick pointing?
-
(Marks out of 10)
11. Is the label signed off before leaving the factory and green dotted?
-
(Marks out of 10)
12. Loading and haulier collection sign off?
-
(Marks out of 10)
13. What training is in place or planned for QC Personnel?
-
(Marks out of 10)
14. QC knowledge of allowable Tolerances for placing of rebar/sockets/cast in details?
-
(Marks out of 10)
Sign Off
-
Auditee
-
Auditor
Audit Summary
-
Number of people working, key activities, key issues, close out actions.