Title Page
-
Site conducted
-
Site Name
-
Address
-
Date and Time of Inspection
-
Company
-
Prepared by
General Information
-
Was the MER in good overall condition with no issues?
-
List MER non conformances
-
Please add photos
-
Was the lighting tested?
-
Please advise reason why
Maintenance Visit Report
1 - Site Access
-
Please include pictures of the access route to the MER
-
1.1 - Can the site be accessed following the access route shown on the drawings/instructions given by Shared Access?
-
Please provide details of any amendments required.
-
1.2 - Is there adequate lighting and emergency lighting along the access route?
-
Please advise of non- conformances
-
Please provide photos
-
1.3 - Is the access route to the MER clear of obstacles?
-
Please provide photos
-
1.4 - General Comments
2 - MER
-
2.1 Does the layout and number of racks installed match the drawings/details given by Shared Access?
-
Please provide photos and a markup of the drawing or sketch
-
2.2 Which operators are connected to the system?
- Three
- Vodafone
- eir
- Telefonica
- EE
-
Please provide photos of Three Racks
-
Please provide photos of Vodafone Racks
-
Please provide photos of EIR Racks
-
Please provide photos of TEF Racks
-
Please provide photos of EE Racks
-
2.3 Which technologies are connected into the DAS ?
-
2.4 General Comments
3 - DAS (Distributed Antenna System)
-
3.1 What type of DAS system is deployed ?
-
3.11 Which Equipment Vendor is deployed ?
-
Please advise on Equipment vendor
-
3.2 Is the DAS monitored ?
-
3.21 Who monitors the DAS and have the logs been checked for alarms or errors?
-
Can the DAS be monitored remotely? Give details
-
3.3 Please provide photographs of the DAS headend
-
3.31 Is the DAS headend in good condition ?
-
Please advise on non-conformances
-
3.4 How many DAS Sectors are deployed ?
-
3.5 Is the system SISO or MIMO
-
3.6 How many RRUs (Radio Remote Units) are deployed ?
-
3.61 Please provide photographs of the RRU locations
-
3.62 Are the RRUs in good condition
-
Please advise of non- conformances
-
3.5 General Comments
-
3.11 Which Equipment Vendor is deployed?
-
Please advise on Equipment Vendor
-
3.3 Please provide photographs of the DAS headend
-
3.4 Is the DAS headend in good condition
-
Please advise on non-conformances
-
Please attach photographs
-
3.6 Is the system SISO or MIMO
-
3.7 How many DAS Sectors are deployed ?
-
3.8 How many antennas or radio heads are deployed?
-
3.9 General Comments
4 - DAS Passive Outreach
-
4.1 Please provide photographs of the passive DAS including antennas and cabling
-
4.2 Is the number of antennas and radio heads deployed in accordance with the design?
-
Please advise on non-conformances
-
4.3 Could all antennas be identified at the time of the inspection
-
Please advise details
-
4.4 Is the condition and equipment and cabling satisfactory?
-
Please provide photos
-
Please advise on non-conformances
-
4.5 - General comments
6 - Electrical Installation
-
6.1 Please provide pictures of the sub-meter(s) and distribution board(s) - both Operator and Landlord
-
6.11 - Sub meter readings (all operators + landlord):
-
6.2 - Are all devices within the Shared Access distribution board labelled correctly?
-
Please advise on non-conformances
-
Please provide photos
-
6.3 - General comments on the Electrical Installations both in MER and RRU locations( If applicable)
7 - Ancillaries
-
7.1 - Is CCTV installed in the MER?
-
7.11 Is the CCTV operational
-
Please provide details
-
7.12 How many cameras are installed?
-
Please provide details of why e.g. not permitted, awaiting installation
-
7.2 - Is there a code lock installed on the MER door?
-
7.21 What type of locking is installed?
-
7.21 Have the batteries been replaced?
-
7.3 - Is there an internet connection available in the MER?
-
7.31 What type?
-
7.4 - Is a UPS battery backup unit installed?
-
7.41 Is the unit working correctly?
-
7.42 Please advise on UPS status
-
7.5 Is there an emergency exit light above the MER entrance door?
-
7.51 Can you locate the isolator switch for this light so it can be tested to work when the main electricity supply to it is cut?
-
7.52 Please isolate and test this light. Does this light stay illuminated when the mains power to it is cut?
-
7.6 General comments
8 - Air conditioning
-
8.1 - Is the air conditioning functioning as expected?
-
Please confirm why not applicable
-
8.3 - What temperature is the air conditioning set to?
-
8.4 - Is a temperature monitoring unit installed?
-
8.41 Is it working correctly?
-
Please provide photos
-
Please provide details.
9 - General Information
-
Please log any additional information, faults or issues here.
Photos
Please add any additional photos
-
MER
-
DAS