Title Page

  • Document No.

  • Depot

  • Conducted on

  • Prepared by

Maintenance Reports

  • Number of WIPS open over 30 days, against previous audit.

  • Summary of maintenance bookings, DR1

  • Summary of maintenance bookings, DR2

  • Closed WIP report for previous month - Report on excessive spend

  • Time allowed on WIPS against time taken. To include 5 examples.

  • HGV MOT pass rate

  • Overdue service report, in excess of 30 days

  • Review workshop administration. E.g. Invoice age profile, volume, etc.

Vehicle Quality Checks

  • Number of QC's completed on LCV monthly (1 in 4 QC's to be Buggies/ATV), including evidence.

  • Number of QC's completed on HGV monthly, including evidence.

  • Correct service sheet is being used; ie topix, etis or autodata?

Transport Vehicles

  • Planners are up to date and compliant?

  • Defect reporting is being recorded and evidence is seen?

  • Cosmetic appearance is to an acceptable standard?

Parts Stock

  • Parts requisition sheet - evidence being used and scanned on with WIP

  • SHB stock not used within 30 days is being managed adequately

Vehicle Warranty Repairs

  • Evidence of in house Land Rover warranty repairs

  • Evidence of WA bookings are being used and managed

Time Recording (Wages)

  • Evidence of clocking on / off during the work day. Including manual entries signed off

  • Are technicians clocking onto the correct labour line for WIPS

  • Weekly workshop loading summary sheet is being signed off by the manager and sent to wages?

  • Review Bradford Factor and action plans are in place

  • Review Non Productive WIPS

Compliance

  • Toolbox talks are being carried out with evidence of attendance sheets

  • LOLER and calibration equipment have in date inspections

  • Evidence of Compliance dates on job cards are being signed off

Apprentices

  • Evidence of block reports from relevant training provider

  • Depot reviews are happening, with block reports being reviewed

  • Is there evidence of Apprentice driving record being implemented and monitored?

  • Performance review with mentor

Vehicle Return Inspectors

  • Evidence of VRI sheets being completed, actioned and filed correctly

  • The damage process is being followed

  • Vehicles are being managed into maintenance and through the process

  • GB inspection sheets are being used?

RMM Quality Inspections

  • Vehicle quality check; 4x4

  • Vehicle quality check; CDV

  • Vehicle quality check; Commercial Vehicle

  • Evidence of paperwork for last PHC/PMI sheet

Workplace Inspections

  • General housekeeping is in an adequate condition; yard and workshop

  • Required tools are in place, good condition and stored correctly?

  • Tool Register is in place and kept up to date?

  • Yard man's time is being used correctly and efficiently?

Overview

  • General Observations / Comments

  • Review audit findings with Depot Manager and Foreman

  • Hold Toolbox Talk with all technical staff

  • Workshop Foreman / Controller

  • Depot Manager

  • Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.