Disabled Pull Cord Alarm Test

  • Site - Hampton By Hilton Sheffield

  • Conducted on

  • Prepared by

  • Location

Disabled Pull Cord Alarm Test

  • Inspection of the Disabled Alarm Panel To ensure the normal operation of the alarm system, checking status of the panel and that any faults are rectified. Weekly Test & Examination Ensure that the alarm system can operate under conditions, by: Operating Trigger Device (Red Pull Cord), making sure the location on the main panel actives and a alarm is activatedExamining any batteries and connections making sure the cord is reachable.

  • Disabled Pull Cord Alarm Test

  • Disabled Alarm (Repeat this section in accordance with the number of areas you have)
  • Date & Time

  • Location red pull cord

  • Full activation achieved

  • Pull cord is fully reachable in an event of an emergency

  • Any damage or defect to pull cord

  • Photo of activation if required.

Signature

  • Enter Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.