Title Page

  • Address of inspection

  • DA number

  • BOND Number

  • Date of inspection

Inspection Type

  • Driveways

Notes from inspection

  • Notes

Issue Bond Refund

  • Issue Bond Refund/Works Satisfactory

Result of inspection

  • Building works are satisfactory

  • Satisfactory - subject to additional requirements

  • Unsatisfactory - Reinspection required

Individual Certifier Details

  • Andrew Clark - BDC 1000

  • Nick Armstrong - BDC 3240

  • Riley Farrell - BDC 05132

Signature

  • Signature

undefined

  • Referenced documents - Engineers/site plan

  • Is proposed site in location consistent with approved plans?

  • Is driveway minimum 100mm thickness?

  • Is driveway layback, dish or pipe?

  • Has expansion joint installed on boundary?

  • Is ableflex installed along the kerb?

  • Is all water runoff into street drainage system?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.