Title Page
-
Conducted on
-
Shift being audited:
-
Prepared by:
-
EE's Currently on Shift:
-
On Shift Supervisor:
Stackers:
-
Did the stacker operators verify the length, width and score deminsons, using a tape measure, for ALL INDIVIDUAL outs?
-
Did the stacker operators verify the board quality of ALL INDIVIDUAL outs? (Warp, bond etc)
-
Did the stacker operators apply current containment processes?
-
Did the stacker operators verify the caliper of the drive, middle and operator side outs and enter the data in IQS?
-
If defects were found at the dry end, did the stacker operators immediately notify the knifeman and the wet end?
-
If an IQS test failed, did the stacker operators notify the supervisor?
-
Are stacks in good condition and free of visible defects?
-
Any unsafe behaviors noticed?
Knifeman
-
Did the knife operator perform required dry end testing? (Soaks, pins and moisture)
-
If an IQS test failed, did the knifeman notify the supervisor?
-
Any unsafe behaviors noticed?
Comments and Feedback
-
Comments/Feedback:
-
Auditor signature: