Information
-
Client
-
Conducted on
-
Prepared by
-
Accompanied by
-
Location
-
This report is to be used by the Field Superintendent and Safety manager to inspect the site and record any environmental hazards and any H&S issues identified. The Field Superintendent and Safety Manager should also pick an area of further inspection (e.g. Emergency arrangements etc) to ensure these are compliant with regulations and in- house procedures
-
Overview of current works
-
Have items from previous inspections been closed out?
Hazard spotting
-
Hazard
-
Close out time scale
-
Closed out by (sign and date)
-
Hazard definition
- 1st aid
- displayed information
- project paperwork
- site welfare
- COSHH
- fire precautions
- safety signage
- work @ height
- excavations
- plant & machinery
- lifting equipment
- crane
- edge protection
- temp works
- hot works
- isolations
- portable tools
- hoist
- MEWPS
- hoarding and fencing
- traffic routes
- access and egress
- PPE
- housekeeping
- environmental
- health hazards
- public interface
- site security
-
Root Causality
- Design
- Error enforcing conditions
- Tools and Equipment
- Housekeeping
- Maintenance Management
- Procedures
- Training
- Communication
- Incompatibility of goals
- Organisation
- Defences
- Sub-contractor
Environmental and Sustainability
-
Are work activities contaminating the Rodway?
-
Are there any signs of sediment discharges leaving the site?
-
Are all storm Water and Erosion Control ( Best management plan) functioning as intended?
-
Reducing / Eliminating paper usage by the use of Fleet and Safety APP on the Project?
-
Are Tire pressure regularly monitored? since underinflated tires can have a major impact on fuel efficiency
-
Are routine and preventive maintenance for all equipment within operations?
-
Are Control of Substances Hazardous to Health (COSHH) items being stored correctly?
-
Are waste and chemicals stored away from drains / drains protected?
-
Has the Environmental Management Plan (EMP) been updated (from tender copy / to reflect site progress)?
-
Have the Site Safety Specific and EMP documents been briefed out to key members of staff (supervisor and above)?
-
Has the project carried out spill training?
-
Is there good planning with regards spill protection?
-
Is Environental monitoring being completed?
-
Is there any evidence of materials / liquids being deposited outside of site boundary? (e.g. Mud on road etc)<br>
Positive observations
-
Positive observation
-
Procedural Compliance
-
Record area of inspection
Non - Compliance
-
Non - compliance noted
-
Causality
- Information Incomplete
- Information not updated
- Not briefed out
- SSOW not followed
- SSOW not understood
- Procedure not followed
- Procedure not understood
- Procedure Inaccurate
-
Closed out (Sign and Date)
EHS Bulletins
-
EHS bulletins up to date and relevant
Inspection Sign off
-
Add signature