Information
-
Document No.
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 Environmental Management
-
1.1 Is the CEMP and ESCP on site and up to date?
-
1.2 Is there evidence that workers have been inducted into the CEMP, associated sub-plans, site environmental conditions and sensitivities?
-
1.3 Has the Contractor been undertaking Environmental Inspections in accordance with the CEMP?
-
1.4 Have previous Action Items been addressed in a timely manner?
-
1.5 Are the Site Plans / Procedures displayed in a prominent position?
2.0 Fuels, Chemicals & Storage
-
2.1 Are refuelling activities being undertaken appropriately (40m away from drainage lines)?
-
2.2 Are all fuels & chemicals being stored appropriately (secure, lockable, sealed & covered areas, bunded with a capacity of not less than 120% of the volume of the largest container)?
-
2.3 Are suitable spill kits & absorbent materials located on site (spill kits should be fit for task & located in proximity to storage & work locations)?
3.0 Geology, Soils & Contamination
-
3.1 Are erosion and sediment control measures in accordance with the "Blue Book"?
-
3.2 Does the ESCP show location of stockpiles, stormwater run-off, trees, site boundaries, site access and storage areas?
-
3.3 Are plant and vehicles cleaned of mud or soils prior to access onto public roads?
-
3.4 Is all imported fill appropriately certified at the source location?
-
3.5 Is waste being disposed of appropriately and in accordance with the waste classification guidelines?
-
3.6 Are Acid Sulphate soils, if present, managed appropriately?
4.0 Hydrology & Water Quality
-
4.1 Is spoil being stockpiled in a manner so as to avoid the possibility of sediments entering waterways or migrating off-site?
-
4.2 Are tankers transporting fuel or hazardous materials parked on level ground and a minimum of 40 metres away from open canals or drains?
-
4.3 Are all worksite drains, channels and gutters clear?
-
4.4 Are all chemicals or other hazardous substances stored in suitable bunded areas away from drainage lines and shown on the ESCP?
-
4.5 Are environmental spill kits containing spill response materials suitable for the works being undertaken, kept on site at all times and are spills being reported to TransGrid?
-
4.6 Are surface and groundwater mitigation measures in place for managing water encountered during construction (water testing, dewatering, temporary water storage, treatment facilities) if required prior to discharge or disposal?
-
4.7 Are dewatering operations being undertaken appropriately (within CEMP limits)?
5.0 Ecology
-
5.1 Is vegetation cleared only where necessary and exclusion zones established?
-
5.2 Are disturbed sites stabilised and areas not required for operation returned to as close to its original condition as soon as possible?
-
5.3 Is plant and machinery cleaned when entering and exiting vegetated areas?
-
5.4 Are weed control strategies effective?
6.0 Erosion & Sediment Control
-
6.1 Are all ESC measures in accordance with the SWMP, ESCP, Best Management Practise and due diligence?
-
6.2 Is off site, clean water, being diverted around the disturbed areas of the site (sand bags, buds, catch drains)?
-
6.3 Is dirty / site water going off site or to drainage through effective filters?
-
6.4 Are static disturbed areas adequately stable or have appropriate erosion and sediment controls (stabilisation is required after 20 days of inactivity)?
-
6.5 Are erosion and sediment control structures being maintained (cleaned at 30% capacity after rainfall events)?
-
6.8 Has all soil and mud from truck movements been cleared from paved or hard surfaces?
7.0 Hazards & Risks
-
7.1 Are all hot works undertaken in accordance with TransGrid's Hot Works and Fire Risk Work procedures?
-
7.2 Do hazardous materials used on site have current SDS's available?
8.0 Heritage
-
8.1 Have all measures required under the environmental assessment (or AHIP) been undertaken?
9.0 Noise & Vibration
-
9.1 Is noise generating work being performed in accordance with the ICNG?
-
9.2 Are all noise generating activities occurring outside of standard hours being approved in accordance with the environmental approval?
-
9.3 Are noise management levels being complied with?
-
9.4 Have there been no complaints from neighbours regarding noise generation since the last inspection?
10.0 Traffic & Access
-
10.1 Are all transportation and deliveries in accordance with RMS conditions?
-
10.2 Are Traffic Management strategies being implemented (delivery, access points, parking)?
11.0 Waste
-
11.1 Is oil filled waste equipment stored, drained and disposed of appropriately?
-
11.2 Is waste being controlled appropriately (in accordance with the Waste Management Plan and Handbook)?
-
11.3 Is the site and surrounds free of waste, litter and rubbish?
-
11.4 Are all waste products being disposed of in designated waste reciprocals?
-
11.5 Has all hazardous and contaminated material been disposed of as per the CEMP and EPA requirements?
-
11.6 Is spoil being stored / disposed of appropriately (both clean and contaminated spoil)?
-
11.7 Are trucks covered and clean before leaving site?
-
11.8 Is the concrete wash out area being maintained effectively?
-
11.9 Are concrete wash out activities "chutes only" (not barrel)?
-
11.10 Are appropriate records for waste disposal maintained (waste register, testing, classification)?
12.0 Air Quality & Climate Change
-
12.1 Are vehicles and equipment being maintained in accordance with the manufacturers specifications?
-
12.2 Are dust suppression techniques adequate?
13.0 Visual Amenity
-
13.1 Is construction plant, equipment, waste and excess materials contained within the designated boundaries and removed following the completion of construction?
-
13.2 Is the work site kept tidy at all times?
14.0 Oil & PCB's
-
14.1 Is oil bearing equipment appropriately stored?
-
14.2 Is oil suspected of containing PCB tested at a NATA certified laboratory?
-
14.3 Is PCB waste appropriately stored?
-
14.4 Is PCB waste been appropriately transported with the correct waste tracking certificate and consignment authority?
15.0 Asbestos
-
15.1 Have staff and contractors been made aware of the asbestos present on site?
-
15.2 Is the removal, handling and disposal of any asbestos waste undertaken by an appropriately licensed contractor and in accordance with the Asbestos Management Plan?
16.0 Site Stabilisation
-
16.1 Are all inactive or completed areas stabilised for erosion to an acceptable level?
-
16.2 If final rehabilitation / revegetation has occurred, is it to an adequate standard?