Information

  • Document No.

  • Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1.0 Environmental Management

  • 1.1 Is the CEMP and ESCP on site and up to date?

  • 1.2 Is there evidence that workers have been inducted into the CEMP, associated sub-plans, site environmental conditions and sensitivities?

  • 1.3 Has the Contractor been undertaking Environmental Inspections in accordance with the CEMP?

  • 1.4 Have previous Action Items been addressed in a timely manner?

  • 1.5 Are the Site Plans / Procedures displayed in a prominent position?

2.0 Fuels, Chemicals & Storage

  • 2.1 Are refuelling activities being undertaken appropriately (40m away from drainage lines)?

  • 2.2 Are all fuels & chemicals being stored appropriately (secure, lockable, sealed & covered areas, bunded with a capacity of not less than 120% of the volume of the largest container)?

  • 2.3 Are suitable spill kits & absorbent materials located on site (spill kits should be fit for task & located in proximity to storage & work locations)?

3.0 Geology, Soils & Contamination

  • 3.1 Are erosion and sediment control measures in accordance with the "Blue Book"?

  • 3.2 Does the ESCP show location of stockpiles, stormwater run-off, trees, site boundaries, site access and storage areas?

  • 3.3 Are plant and vehicles cleaned of mud or soils prior to access onto public roads?

  • 3.4 Is all imported fill appropriately certified at the source location?

  • 3.5 Is waste being disposed of appropriately and in accordance with the waste classification guidelines?

  • 3.6 Are Acid Sulphate soils, if present, managed appropriately?

4.0 Hydrology & Water Quality

  • 4.1 Is spoil being stockpiled in a manner so as to avoid the possibility of sediments entering waterways or migrating off-site?

  • 4.2 Are tankers transporting fuel or hazardous materials parked on level ground and a minimum of 40 metres away from open canals or drains?

  • 4.3 Are all worksite drains, channels and gutters clear?

  • 4.4 Are all chemicals or other hazardous substances stored in suitable bunded areas away from drainage lines and shown on the ESCP?

  • 4.5 Are environmental spill kits containing spill response materials suitable for the works being undertaken, kept on site at all times and are spills being reported to TransGrid?

  • 4.6 Are surface and groundwater mitigation measures in place for managing water encountered during construction (water testing, dewatering, temporary water storage, treatment facilities) if required prior to discharge or disposal?

  • 4.7 Are dewatering operations being undertaken appropriately (within CEMP limits)?

5.0 Ecology

  • 5.1 Is vegetation cleared only where necessary and exclusion zones established?

  • 5.2 Are disturbed sites stabilised and areas not required for operation returned to as close to its original condition as soon as possible?

  • 5.3 Is plant and machinery cleaned when entering and exiting vegetated areas?

  • 5.4 Are weed control strategies effective?

6.0 Erosion & Sediment Control

  • 6.1 Are all ESC measures in accordance with the SWMP, ESCP, Best Management Practise and due diligence?

  • 6.2 Is off site, clean water, being diverted around the disturbed areas of the site (sand bags, buds, catch drains)?

  • 6.3 Is dirty / site water going off site or to drainage through effective filters?

  • 6.4 Are static disturbed areas adequately stable or have appropriate erosion and sediment controls (stabilisation is required after 20 days of inactivity)?

  • 6.5 Are erosion and sediment control structures being maintained (cleaned at 30% capacity after rainfall events)?

  • 6.8 Has all soil and mud from truck movements been cleared from paved or hard surfaces?

7.0 Hazards & Risks

  • 7.1 Are all hot works undertaken in accordance with TransGrid's Hot Works and Fire Risk Work procedures?

  • 7.2 Do hazardous materials used on site have current SDS's available?

8.0 Heritage

  • 8.1 Have all measures required under the environmental assessment (or AHIP) been undertaken?

9.0 Noise & Vibration

  • 9.1 Is noise generating work being performed in accordance with the ICNG?

  • 9.2 Are all noise generating activities occurring outside of standard hours being approved in accordance with the environmental approval?

  • 9.3 Are noise management levels being complied with?

  • 9.4 Have there been no complaints from neighbours regarding noise generation since the last inspection?

10.0 Traffic & Access

  • 10.1 Are all transportation and deliveries in accordance with RMS conditions?

  • 10.2 Are Traffic Management strategies being implemented (delivery, access points, parking)?

11.0 Waste

  • 11.1 Is oil filled waste equipment stored, drained and disposed of appropriately?

  • 11.2 Is waste being controlled appropriately (in accordance with the Waste Management Plan and Handbook)?

  • 11.3 Is the site and surrounds free of waste, litter and rubbish?

  • 11.4 Are all waste products being disposed of in designated waste reciprocals?

  • 11.5 Has all hazardous and contaminated material been disposed of as per the CEMP and EPA requirements?

  • 11.6 Is spoil being stored / disposed of appropriately (both clean and contaminated spoil)?

  • 11.7 Are trucks covered and clean before leaving site?

  • 11.8 Is the concrete wash out area being maintained effectively?

  • 11.9 Are concrete wash out activities "chutes only" (not barrel)?

  • 11.10 Are appropriate records for waste disposal maintained (waste register, testing, classification)?

12.0 Air Quality & Climate Change

  • 12.1 Are vehicles and equipment being maintained in accordance with the manufacturers specifications?

  • 12.2 Are dust suppression techniques adequate?

13.0 Visual Amenity

  • 13.1 Is construction plant, equipment, waste and excess materials contained within the designated boundaries and removed following the completion of construction?

  • 13.2 Is the work site kept tidy at all times?

14.0 Oil & PCB's

  • 14.1 Is oil bearing equipment appropriately stored?

  • 14.2 Is oil suspected of containing PCB tested at a NATA certified laboratory?

  • 14.3 Is PCB waste appropriately stored?

  • 14.4 Is PCB waste been appropriately transported with the correct waste tracking certificate and consignment authority?

15.0 Asbestos

  • 15.1 Have staff and contractors been made aware of the asbestos present on site?

  • 15.2 Is the removal, handling and disposal of any asbestos waste undertaken by an appropriately licensed contractor and in accordance with the Asbestos Management Plan?

16.0 Site Stabilisation

  • 16.1 Are all inactive or completed areas stabilised for erosion to an acceptable level?

  • 16.2 If final rehabilitation / revegetation has occurred, is it to an adequate standard?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.