Title Page

  • Site name

  • Conducted on

  • Prepared by

  • Location

Mains Distribution Info

  • Where is the mains room located?

  • Where is the Generator located?

  • Where is the Transformer located?

  • Does the site have a VO?

  • What rating is the VO? (kVa)

  • What are the readings on the home screen?

  • What is the rating of the main switch? (amps)

  • is the panel split into essential and none essential?

  • Essential panel rating? (amps)

  • Non-Essential rating? (amps)

  • What is the rating of the panel board?

  • Is main meter data available?

  • Please detail any spare ways available for supplies greater than 100 Amp.

  • Please detail any spare ways available for supplies greater than 100 Amp.

  • Has the store got type 1 surge protection?

Homeshop Details

  • Homeshop manager at point of visit.

  • How many vans are currently being used?

  • Where are the vans parked over night?

  • How many vans fit under the canopy?

  • What is the route of the cable to the home shop canopy?

  • Where will the DC charger be best located to ensure it is protected against impact, protected from the weather and accessible to the front of the van?

  • Does the proposed location of the DC charger require vans to enter the canopy forwards?

  • Does the canopy have bird netting?

  • is the canopy and locations of all chargers sufficiently lit (make assumptions of night time performance based on all available light fittings being functional).

Click and Collect Details

  • Is the Click and Collect canopy situated within close proximity (less than 10m) to the Homeshop?

  • How far from the home shop area is the canopy? (meters)

  • How many parking spaces are under the canopy?

  • Are there any restrictions in terms of length or width to get a home shop van into the canopy?

Customer Access Chargers

  • Where is the best option for location of customer accessible chargers?

  • What is the route of the supply cable to the customer chargers?

  • where the route isn't in metallic containment highlight as much as possible the parts of the route that are soft dig and the parts that are underground?

  • is there a requirement for an external GRP enclosure?

  • Will the home shop vans cause a narrowing of a traffic route or accessibility issues for customers?

  • Does the area appear to be sufficiently lit for night time operations?

Existing EV Charging Stations

  • Are there any existing EV charging stations available to customers?

  • how many chargers are installed?

  • what is the brand and rating of the chargers?

  • where are the chargers located?

  • Where are the existing chargers fed from?

Other Information

  • Is there any other relevant information from the survey that would influence the installation of EV chargers?

  • highlight the relevant information and add as many photos as necessary.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.