Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Survey
-
Is the charging equipment been installed in an optimum location with respect to the intended vehicle parking position?
-
Is the EV charging equipment been installed in a location to minimize the likelihood of vehicle impact damage?
-
If required, are protective barriers to be provided?
-
Are the main operating controls and any sockets-outlets going to be between 0.75m and 1.2m above the ground, and displays between 1.2m and 1.4m above ground?
-
Will there be sufficient space around the charging equipment to open all doors and covers?
-
Will there be sufficient space around the charging equipment for ventilation and cooling purposes?
-
Have all trip hazards been considered and , where possible, avoided?
Electrical
-
Number of phases
-
Is the incoming supply metered?
-
What is the incoming supply?
Installation Photos
-
EV charger installed to be installed
-
EV charger location
-
Fuse board
-
Cutting loop
-
Electric Meter
-
Earthing arrangement
Completed by
-
Commissioning Date
-
Engineer Signature