Title Page
-
Site conducted
-
Level
- L1
- L2
- L3
- L4
- L5
- L6
- L7
- L8
- L9
- L10
- GROUND FLOOR
- BASEMENT
-
Block
- B5
- B6
- B7
- B8
- B9
- B1
- B2
- B3
- B4
M&E
-
All Trunking, tray, basket and conduit correctly aligned.
-
Installation securely fixed and supported at correct intervals.
-
All Trunking, tray, basket and conduit bends and sets satisfactory.
-
Trunking compartments and tray installation satisfactory cleaned.
-
Cables have been installed in accordance with specification and drawings.
-
Cables installed neatly
-
Cable cleats/tie wraps in accordance with the specification.
-
Pictures
Sign off
-
MBS Sign off By
-
Signature
-
BWL Manager
-
Signature