Title Page
-
Site address
-
Conducted on
-
Prepared by
-
Location
Service and ECV
-
Service laid to SGN Specification?
-
ECV fitted correctly?
-
Gas ON/OFF tape present?
Meter and Regulator
-
Is meter box correctly sited?
-
Is meter bracket fixed to wall/floor?
-
Is internal meter positioned correctly?
-
Are sheer bolts installed?
-
0800 number on meter?
-
Test nipple checked?
-
Tightness test satisfactory?
-
Regulator working pressure correct? in mb
-
Regulator sealed?
Health and safety (work in progress)
-
Is all appropriate PPE being worn?
-
Voltstick and temp earth bond used?
-
Working at height?
-
Manual handling procedures adhered to?
-
Waste being disposed of correctly?
-
Pipe/cable locator used?
-
All electrical items PAT tested and in date?
-
Does the fitter have 2 x working voltsticks?
Customer
-
Identification shown to customer?
New Pipework
-
Length of pipework installed
-
Length of pipework claimed
-
Is there a difference between the length install and length claimed?
-
Is pipework straight and level/plumb?
-
Is pipework suitable clipped?
-
Is pipework sleeved?
-
Is pipework fitted to minimum standards?
Equipotential bonding
-
Has cross bonding been affected?
-
Where bonding is substandard or not present has a card been left?
-
Is clamp position satisfactory?
-
New cable installed?
-
Length of cable installed
-
Has cable been installed correctly?
-
Model:
-
Location:
Appliances
-
All appliances relit by engineer?
-
Number of appliances:
-
Type and location of appliances
-
1.
-
2.
-
3.
-
4.
-
5.
-
6.
-
7.
-
8.
-
9.
Quality inspector and customer comments and feedback
-
Please add comments and feedback below
-
undefined
Photos
-
Add media
Sign off
-
Name
-
Date and time