Section 4

  • Project Reference

  • Project Name and Phase

  • Date

  • Contractor / Subcontractor

  • Inspected by

Footpath Construction

Footpath Construction (2mtr) (Cycleway 3mtr)

  • Footpath Construction

  • Pencil Kerbs Installed

  • Road Kerbs Installed

  • Type 1 showing the correct depth (70mm min to TOK)

  • Ironwork Level

  • Drainage Installed to Driveways if falling to the Road

Material Specification

  • Material Type

  • Tack Coat Applied and Dry

  • Surfacing Method

Bitumen Paving Grade

  • Bitumen Grade Specification

Temperatures

  • Air Temperature (at or above 1 Degree's Celsius)

  • Ground Temperature (At or below 2 Degree's Celsius)

  • Wind Speed Table to be used in conjunction with air Temperatures

    Wind Speed.PNG
  • Wagon 1 Vehicle Reg, Temperature on arrival, Temp in Hopper, Temp before Rolling

  • Wagon 2 Vehicle Reg, Temperature on arrival, Temp in hopper, Temp before Rolling

  • Wagon 3 Vehicle Reg, Temperature on arrival, Temp in Hopper, Temp before Rolling

  • Wagon 4 Vehicle Reg, Temperature on arrival, Temp in Hopper, Temp before Rolling

Testing

  • Straight Edge Compliant

  • Griptesting Compliant

  • White lining Complete

Certification.

  • Partial Completion Schedule 1

  • Schedule 1 Complete

  • Schedule 2 Complete

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.