Location
Location
Address
Comments
Select
Path around PWS pit cracked
Section of path sunken
Path lifting at construction joint from tree roots
Crack(s) in section(s) of path
Section(s) of path cracked at corner(s)
Edge of path cracked and/or broken
Telstra pit/lid sunken, lifted, cracked or broken
Section(s) of path cracked throughout
Generalised cracking and deterioration
Edge drop along section(s) of path
Chip(s) in path
Trench repair sunken
Path lifted or sunken at construction joint
Power and water sewer pit raised above path level
Section(s) of path cracked and or lifting
.
Path around PWS pit cracked Section of path sunken Path lifting at construction joint from tree roots Crack(s) in section(s) of path Section(s) of path cracked at corner(s) Edge of path cracked and/or broken Telstra pit/lid sunken, lifted, cracked or broken Section(s) of path cracked throughout Generalised cracking and deterioration Edge drop along section(s) of path Chip(s) in path Trench repair sunken Path lifted or sunken at construction joint Power and water sewer pit raised above path level Section(s) of path cracked and or lifting .
Comments
Photos
Media
Cracking
C1 Cracks >20mm in width
C2 Cracks <20mm & > 10mm in width
C3 Cracks <10mm in width
NA
Trip Hazard
C1 Step or gap >20mm in height or width
C2 Step or gap <20mm & > 10mm in height or width
C3 Step or gap <10mm in height or width
NA
Debris or Rubbish
C1 debris or rubbish that pose a hazard
C2 significant amount of debris or rubbish
C3 minor amounts of debris or rubbish
NA
Edge Drop
C1 height difference >100mm
C2 height difference <100mm & >50mm
C3 height difference <50mm
NA
Slippery surface.
Suggested repair action
Select
NA
Asphalt patch
Replace marked section
Forward to telstra
Forward to NBN
Forward to Power and Water
Forward to developer
Place and compact select fill
Place topsoil and seed with grass
Grind lip or raised section
Patch with epoxy
Remove debris or rubbish
Clean or remove slip hazard
NA Asphalt patch Replace marked section Forward to telstra Forward to NBN Forward to Power and Water Forward to developer Place and compact select fill Place topsoil and seed with grass Grind lip or raised section Patch with epoxy Remove debris or rubbish Clean or remove slip hazard
link copied
Chris Johnson
Footpath Inspection Report
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions.
The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice.
You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction.
You should independently determine whether the template is suitable for your circumstances.