INFORMATION

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

SITE SPECIFIC DETAILS

INTRODUCTION

  • Task

  • Asbestos Material

  • Asbestos Type

  • Start Date

  • Completion Date

  • Condition of Material

  • Quantity

  • Removalist Firm

  • Name of Onsite Supervisor

  • Notification

PLANNING & DOCUMENTATION

  • Has all workers on site attended a site induction?

  • Identified documents on site?

  • Have the relevant documents been read and understood and have they signed?

  • Are the risk assessments suitable, sufficient and relevant to the outside activities?

  • Identified hazards on site

CONTROL PLAN

  • Does the site layout agree with the drawings and photos and include the correct enclosure sizes and locations?

  • Is the supervisor on site the one listed in the Control Plan?

  • Is the scope of works/methodology/material adequately described in the Control Plan?

  • Does the Control Plan detail when the work is to be carried out? (including start/finish times and weekend variations)

  • Does the Control Plan detail the type of respirators to be used?

  • If the Control Plan has been amended, has it been signed/dated and do other records (e.g site diary) show the authorisation procedure has been followed?

HYGIENE FACILITY/DECONTAMINATION UNIT

  • Is the air clearance certificate for the DCU available?

  • Is the DCU connected to the enclosure?

  • Is the transit procedure in accordance with the Control Plan?

  • Is the outside of the unit clean?

  • Are there sufficient DCU's/showers for the number of personnel on site? (1 shower: 4 persons)

  • Are the DCU legs down and is it level and is it connected to the mains water and power? Is the unit adequately earthed?

  • Are there usable warning signs on the exterior clean/dirty entry doors?

  • Have lockers been provided in the clean end?

  • Are there adequate methods of heating the DCU in old weather?

  • Do the showers have adequate supply of hot water?

  • Is there a gas detector fitted?

  • Are all doors (internal and external) self closing?

  • Is the waste water from the DCU filtered and discharging to foul sewer?

  • Does the DCU have an extraction fan fitted with a HEPA filter fitted on the dirty external wall? (does it have a current DOP/electrical test cert)

  • Are the latest emergency evacuation instructions posted in the clean end of the DCU?

  • Has the check sheet been completed and is the log book up to date?

  • Have a liquid soap, shampoo, nail brushes and clean dry towels been provided for the thorough decontamination of the removal personnel?

  • Are hooks available in the shower to hang RPE whilst showering?

  • Are all vents clear of dust and ingrained dirt?

  • Are all seals (wall to floor, wall to wall sinks, etc) in place?

  • Are the sinks and waste system clean of dust?

  • Is flooring worn to a level that ingrained dirt cannot easily be removed?

  • Is the NPU and area underneath clear of dirt and in a dry condition? Can you see the flow meter?

  • Are there sufficient, working power points in the clean end to charge RPE battery packs?

  • Is the DCU set correctly in accordance with above?

  • Have you checked the DCU hose?

SITE PREPARATION

  • Has all non-contaminated loose equipment and material been removed from the working area?

  • Have all floor ducts, risers, electrical sockets and other openings been covered and sealed inside the area?

  • Has a supervisor confirmed all openings in plant, pipes, walls & ceilings (including hidden voids) been sealed?

  • Has all electrical plant been isolated or effectively protected from the ingress of water or surfactant materials?

  • During preparation/sheeting is the correct PPE & RPE being used?

AIRLOCK/BAGLOCK

  • Does airlock consist of at least 3 (1x1x2m) compartments with vision panel (600x300mm) located in dirty end?

  • Is the outer flap in place?

  • Are the flaps weighted at the bottom and taped?

  • Do the flaps overlap and cover the openings?

  • Is there a hand-held spray in the dirty end?

  • Is the airlock tidy and free of all dust, dirt and debris?

  • Does the airlock have suitable signage?

  • Is there a baglock? If not, please state reason why? If yes, does it consist of at least 3 (1x1x2m) compartments with vision panel (600x300mm) located in dirty ends?

WORK AREA/ENCLOSURE

  • Is the enclosure constructed in accordance with the general procedures (200um gauge poly; 50mm2 timber or use cleanable surfaces of area)?

  • Is flame retardant polyethylene required by Control Plan, is it being used?

  • Has a clear Perspex inspection/viewing pale (600x300mm min.) or CCTV been incorporated into the enclosure?

  • Are the work areas/enclosures on carpet? If so, has been boarding been used to overlay the carpet?

  • Are there sufficient ASBESTOS warning signs displayed around the area?

  • Identified other site security measures in place

PPE

  • Are the asbestos removal operatives wearing full disposable coveralls, with a hood (type 5, cat 3)? If not, why?

  • Are they wearing gloves and Wellington boots?

  • Are the coveralls on the outside of their boots?

  • Are their hoods on the outside of their RPE harness strap?

  • If a transit procedure being operated, are work and transit coveralls of a different colour?

  • Is RPE worn as stated in the Control Plan?

  • If any personnel are entering the area or have just exited the DCU, are they clean shaven?

  • Is any other PPE required on site and is it being used?

  • Identify other PPE being used

CONTROL MEASURES: - DUST REDUCTION/WET STRIPPING

  • Is the system being used in accordance with that specified in the Control Plan?

  • Is the system set up and working?

  • Satisfied that the dust levels are being reduced to the lowest practicable levels?

  • Do the results of the control air monitoring indicated that the methods used are effective?

  • Are the surfactants/wetting agents only been used on cold surfaces?

  • Check the service records of the equipment. Has it been serviced according to the manufacturers schedule?

NEGATIVE PRESSURE UNITS

  • Does the unit(s) extract from the enclosure at a point far enough away from the airlock enclosure as possible to ensure good air flow through the enclosure without any dead spaces? Is there sufficient negative pressure?

  • Is NPU(s) correctly sheeted to enclosure wall, or if inside, sheeted over including vent hose?

  • Does the unit(s) vent to atmosphere outside the building? Or if venting inside, is regular air monitoring being undertaken?

  • Does the pre-filter look to be working efficiently?

  • Is the ducting in good condition?

HEPA VACUUM CLEANERS

  • Is there one in the area near the airlock for decontamination?

  • Are the hoses and electric flex in good condition?

  • Are the vacuum cleaners working efficiently?

  • Have they got current DOP/electrical test certificates?

WASTE HANDLING & DISPOSAL

  • Is there a suitable waste disposal route for the bags with suitable signage?

  • Are the bags marked in accordance with the current legislative requirements?

  • Is the waste double bagged?

  • Are bags being overfilled?

  • If waste is being temporarily stored, is the area labelled and secured?

  • What condition is the skip? Is it lockable? Are suitable signs present?

  • Does the waste route follow the one in the Control Plan?

TRANSIT PROCEDURES

  • Is transit footwear available and is it stored in clean section of airlock?

  • Are there sufficient pairs for the number of people in the work area?

  • Are transit coveralls stored in clean end of airlock?

  • Does the transit route go over 'exposed' carpeted areas?

  • Is there signage to show transit route?

  • If site is occupied (other trades, etc) is transit route barriered off or are personnel accompanied?

AIR MONITORING ARRANGEMENTS

  • Is AAC identified in the Control Plan as undertaking the air monitoring?

  • Is a communication plan established between AAC and site supervisor?

COMMUNICATION

  • Is there a suitable system in place to allow easy two-way communication between workers inside the enclosure and those working outside the enclosure?

EMERGENCY PROCEDURES -are they in place/available for:

  • Medical emergency inside the enclosure?

  • Loss of electric power?

  • Failure of the enclosure?

ADDITIONAL COMMENTS & CORRECTIVE ACTIONS

  • Please enter comments

  • List non-conformance issues and points

  • Signature of Supervisor

  • Signature of Class A Asbestos Assessor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.