Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Roof
-
Correct Roof Colour
-
Correct profile
-
Correct Roof Material
-
Roof Screws in line
-
Hip and ridge Capping straight and secure
-
Anticon Blanket Installed . No exposed insulation in gutter
-
Garage parapet correct for fire rating
-
intermittent battens installed leaving 450 openings
-
Roof penetrations all in as per plan . Flu 150mm through roof for connection
-
Parapet transfer junction flashings installed ready for paper
-
Valleys straight not tin can
-
correct battens . Less than 5 Degree timber battens installed
-
turn Ups for transition flashings and turn downs for box gutter completed
-
raised rooves correct soakers
Facia gutter
-
correct colour
-
Gutter has fall
-
Gutter correct profile
-
facia straight and plumb
-
Facia correct distance off wall ...i;e allow for cladding of brick
-
facia at splits in line with upper and flashed
-
facia barge capping installed on skillion rooves
-
Barges installed , correct distance off the wall
-
Black flex poly Temp Downpipes installed and into stormwater system
-
box gutter chute all in one square and sealed at brick or cladding
-
downpipes transition from Cladding to brick at correct angle and not 90 degrees
-
correct pops . Square profile for leaf eater and Gutter . Round pops for PVC connected
-
Check orders / plans for non - standard items
Flashing
-
Parapet Capping correct fall into gutter blocking used and top screwed to stop vibration
-
Transfer flashings at Jump ups correct sealed and turned up
-
cladding and transition flashing correct fall out
-
window head flashing installed for cladding
House Keeping
-
Bin in place
-
Site left in a safe manner
-
G.J sign and danger sign up
-
Job left clean, rubbish in bin.
Are any rectification works required?
-
Works required
-
Date to be completed
-
Signature of person conducting the Audit