Title Page
-
Job title
-
Prepared by
Project Information
Job Address
Job Number
Customer
Customer contact
Contact number
Job manager
Start date
-
Select date
Description of works to be carried out:
Photographs (if required)
-
Add media
Project Information (Continued)
Project Duration (if over 5 days a site pack is required)
Welfare arrangements:
-
Welfare facilities provided by main contractor
-
Graham Roofing to provide welfare facilities. (Please specify below)
-
Not applicable
-
Please specify arrangements if not listed above
Site security / storage
-
Site security and storage requirements:
Material lifting
-
Rope and wheel
-
Hoist (please specify)
-
Please specify:
Permits required
-
Skip
-
Scaffold
-
Parking bay closure
-
Road/lane closure
-
Not applicable
-
Other
-
Please specify:
Environmental considerations
-
Please specify
Project Scope and RAMS
SECTION A: PROPERTY TYPE AND ARRIVAL PROCEDURES
-
Please select a property type.
- A1 Domestic Properties
- A2 Public Building
- A3 Construction Site
- A4 Industrial Building / Large shop units
- A5 Educational Building
- A6 Airport
-
Supplementary information relating to property and arrival procedures:
SECTION B: ACCESS TO WORK AREA
-
Please select access arrangements
- B1 Hatch / Extension Ladder
- B2 3Part Extension Ladder
- B3 Cherry Picker (self operated)
- B4 Cherry Picker (driver operated)
- B5 Scissor lift
- B6 Aluminium Tower
- B7 Scaffold (by others)
- B8 Roof ladder
- B9 Access to roof via attic
-
Supplementary information relating to access arrangements:
SECTION C: FALL PREVENTION
-
Please select fall prevention method
- C1 Saddle ladder
- C2 Existing man safe system
- C3 Self assembly man safe system
- C4 Harness and line
- C5 Edge protection / handrails
- C6 Safety nets
- C7 Personal rescue device
-
Supplementary information relating to fall prevention:
SECTION D: TASK RELATED
-
Please specify task related activities.
- D1 Reactive roof maintenance
- D2 Torch on felt work
- D3 Brick and stone work
- D4 Roughcast and Render
- D5 Plasterwork
- D6 Glazing
- D7 Lead work
- D8 Joinery
- D9 Rot works
- D10 Stripping old roof coverings
- D11 Renew existing roof board
- D12 Lifting materials to roof
- D13 Installation of tiles
- D14 Installation of slates
- D15 Demolition of chimneys
- D16 Rebuilding of chimney
- D17 Gutter and downpipes
- D18 UPVC Fittings
- D19 Painting
- D20 Repair work in attic
- D21 General building work
- D22 Liquid Plastic
- D23 Gutter Cleaning
- D24 Single ply
-
Supplementary information relating to task:
SECTION E: COSHH
-
Please specify:
SECTION F: TOOLS AND EQUIPMENT
-
Please specify tools and equipment required.
- F1 Hand tools
- F2 Electric Saws
- F3 Electric drills
- F4 Nail guns
- F5 Abrasive wheels
- F6 Scaffold Hoist
- F7 Pneumatic hoist
- F8 LPG and Torch
- F9 Oxy and acetylene
- F10 Paddle mixer
- F11 Pneumatic hammer
- F12 Gin wheel
- F13 Telescopic water pole
- F14 heat guns
-
Supplementary information relating to tools and equipment:
SECTION G: OTHER HAZARDS
-
Please specify other hazards
- G1 Pedestrians
- G2 Home occupiers
- G3 Students / Pupils
- G4 Young employees
- G5 workers in premises
- G6 Others on site
- G7 Personal property
- G8 Electricity
- G9 Dust
- G10 Noise
- G11 Sun
- G12 Vibration
- G13 Lone working
- G14 Fragile roofs
- G15 Asbestos
- G16 Gable ends
- G17 Open rafter work
- G18 Gas flues
-
Supplementary information relating to other hazards:
Other information (if applicable)
-
Add media
Final section
Emergency arrangements
-
First aid box location
-
Location of nearest A&E Hospital
PPE Requirements
-
- Safety hat
- Hi vis vest
- Safety glasses
- Safety boots
- Gloves
- Respiratory protection
- Hearing protection
- Safety harness
- Other (please state)
-
List any additional PPE that is required:
Managers signature
-
Add signature