Information
-
Audit Title
-
Document No.
-
Conducted on
-
Client / Site Union Pacific Global 2
-
Auditors Name
-
Train(s) being audited
-
Each train must has its own folder with symbol and train day on the tab.
-
Does each track loaded have the Securement SOP form filled out completely and signed by the securement team as well as the Manager who performed the unit verification?
-
Does each track for the train have the original Managers unit verification?
-
Does each individual unit loaded have a checkmark and all changes clearly noted by the Manager?
-
Has each individual page been signed by the Manager?
-
Does each track for the train have the original Lotcheck Clerk's unit verification?
-
Does each individual unit loaded have a checkmark and all changes clearly noted by the Lotcheck Clerk?
-
Has each individual page been signed by the Lotcheck Clerk?
-
Does each track used for the train have a print out of the "Brief Track" which gives a list of the car numbers on the track?
-
Does each track used have a "clean" loaded printout (Track > Full > View > Outbound) after all changes have been made and verified?
-
Does each track have a finalized copy of the "Load Track" (Track > Load) which shows every unit on each tub or hitch with weights, blocking and destination information?
-
Is the finalized copy of the "Load Track" printed out in landscape format (File > Print > Preferences > Orientation > Landscape) so we can view all of the relevant information?
-
Is a fax verification sheet included for each track used?
-
Does each folder contain a copy of the Bad Order Car form?
-
Along with the "Bad Order Car Form, is there a printout of each individual car with westbound traffic on it that is listed as bad order?
Missout Folder
-
Is the cover sheet fully filled out & are there N/A for blanks so auditors know nothing was skipped?
-
Is a printout of the completed Terminal Planner included?
-
Is a printout of the Missout By Shipper report included?
-
Is there a printout of the Train Summary (Destination)?
-
Are the destination(s) this folder is for highlighted?
-
Is there a printout of each destination rg?
-
Are the missouts and/or exceptions highlighted & notated?
-
Is a finalized copy of the "Load Track" which shows each unit on each tub or hitch with weights, blocking and destination information included?
-
Any other observations?
-
Other observations photos.