Painting - Checklist
Spray Paint
-
Confirm for updated drawings, RFI's, plans & specs
-
Have all draw-downs been submitted and approved
-
If precast or concrete, does the substrate need to be power washed
-
Confirm that all items not to receive paint have been protected from overspray
-
Confirm that duct work or any other form of air movement has the correct filters installed to reduce fume transfer
-
Are all surfaces free of rust, stains, fireproofing, or anything else that may cause a flaw to the finish surface
-
Confirm that all substrates are at the correct temperature to receive material
-
Confirm that all substrates are not wet or contain too much moisture
-
Do all sprayed surfaces have a uniform finish
-
Is the wind calm enough not to cause overspray to carry a distance
-
Have all trades either moved or protected their stored materials from overspray
-
Are all MEP's complete before spray
-
Have sprinkler heads been protected from spray
-
Have smoke detectors been protected from spray
-
Confirm the paint is the correct product from the correct manufacturer
-
Are all coatings applied to the correct MIL thickness
-
If precast or concrete, is the pH level at an acceptable range
-
Have all protection materials (i.e. tape, plastic, foil) been removed from items that were being protected (i.e. hinges, convectors, sprinkler heads)
-
Look for imperfections before the architect creates the punch list
-
Confirm clean-up of our material and scrap
-
Did you walk and inspect the job site with the G.C.
-
Paint Brush & Roll
-
Confirm for updated drawings, RFI's, plans & specs
-
Have all draw-downs been submitted and approved
-
Confirm that the taping quality is ready for paint prior to finish coat
-
Do any walls receive a level 5 finish
-
Have all MEP trades completed their work (including any demo and re-installation)
-
Were all drywall patches sanded
-
Were drywall patches spot primed
-
Confirm the ceiling and floor base heights are finish taped to the right height
-
Is the lighting adequate to install the finish coat
-
Are all trades complete before the installation of any specialty finishes
-
After applying the finish coat, are all walls free from damage
-
Do all surfaces have a uniform finish
-
Have you walked the project looking for imperfections prior to the architect creating a punch list
-
Confirm clean-up of our material and scrap
-
Did you walk and inspect the job site with the G.C.
Completion
-
Comments
-