Title Page
-
HL Job Number
-
Job Site Name
-
Conducted on
-
HL QAQC Inspector
-
Job Site Area of QAQC Inspection
Wall Backing - Checklist
-
Confirm for updated drawings, RFI's, other shop drawings, and equipment plans for locations of backing
-
Confirm MEP installation complete
-
Confirm appropriate type of backing (sheet metal, danback, dimensional lumber, plywood, etc)
-
Confirm screws and screw pattern on backing at studs is installed per plans and specs
-
Confirm notched backing does not touch MEP and dissimilar metals in wall
-
Confirm cleanup of our cartons and scrap materials
-
Inspect and walk the site with G.C. Superintendent
Completion
-
Comments
-
HL QC Inspector