Title Page

  • HL Job Number

  • Job Site Name

  • Conducted on

  • HL QAQC Inspector

  • Job Site Area of QAQC Inspection

Wall Backing - Checklist

  • Confirm for updated drawings, RFI's, other shop drawings, and equipment plans for locations of backing

  • Confirm MEP installation complete

  • Confirm appropriate type of backing (sheet metal, danback, dimensional lumber, plywood, etc)

  • Confirm screws and screw pattern on backing at studs is installed per plans and specs

  • Confirm notched backing does not touch MEP and dissimilar metals in wall

  • Confirm cleanup of our cartons and scrap materials

  • Inspect and walk the site with G.C. Superintendent

Completion

  • Comments

  • HL QC Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.