Title Page
-
HL Job Number
-
Job Site Name
-
Conducted on
-
HL QAQC Inspector
-
Job Site Area of QAQC Inspection
Head of Wall - Checklist
Head of Wall
-
Confirm for updated drawings, RFI's, plans & specs
-
Confirm fire caulk is used to seal gaps at concrete substrate only
-
Confirm mineral wool and fire spray is to be used to seal gaps at metal/steel penetrations
-
Confirm surrounding finishes are protected
-
Confirm fire taping is completed and mineral wool inspection done
-
Confirm wet fire spray material is inspected to 1/8" thickness
-
Confirm proper substrate overlap per manufacturer's requirements
-
Confirm no pinholes are visible in the spray
-
Confirm proper information and location of sticker on wall
-
Confirm exposed ceiling areas have acceptable finish to receive spray
-
Confirm cleanup of our cartons and scrap materials
-
Inspect and walk the site with G.C. Superintendent
Head of Wall Insulation Prior to Spray
-
Confirm for updated drawings, RFI's, plans & specs
-
Confirm mineral wool and spray, per approved submittals, are on site
-
Confirm drywall is down from substrate 1" or per manufacturer's requirements if different
-
Confirm speed plugs are installed in flutes above top track and speed strips installed above drywall below speed plug and below valley of flute at proper compression per manufacturer's requirements
-
Confirm mineral wool at beam is packed tight around beams and flush with drywall per manufacturer's requirements
-
Confirm there are no gaps between compressed speed plug and decking
-
Confirm there are no gaps between the ends of speed strips in all areas
-
Confirm fire taping is complete prior to spray application
-
Confirm drywall screw inspection was done
-
Confirm mineral wool has been inspected prior to spray
-
Confirm fire taping is complete prior to fire spray application
-
Confirm cleanup of our cartons and scrap materials
Completion
-
Comments
-
HL QC Inspector