Title Page

  • HL Job Number

  • Job Site Name

  • Conducted on

  • HL QAQC Inspector

  • Job Site Area of QAQC Inspection

Interior Drywall - Checklist

  • I.D.I. QAQC Inspector

Prior to One-Side

  • Confirm for updated drawings, RFI's, plans & specs

  • Confirm MEP's are not protruding beyond stud plane

  • Confirm MEP strapping not bulging beyond stud plane

  • Confirm all framing, backing and H.M. frames have not been damaged

  • Confirm framing and MEP installation is complete prior to close-up

  • Confirm framing and backing QC forms are signed-off

One-Side

  • Confirm HM frames are plumb

  • Confirm correct fasteners are spaced per plans and specs

  • Confirm holding up drywall 5/8" from floor substrate

  • Confirm joints are butted per plans and specs

  • Confirm C.J. are installed per plans and specs

  • Confirm installation of sound caulk, if applicable, from bottom of drywall to floor substrate and top of drywall to deck substrate

Second-Side

  • Confirm track cavities are cleaned

  • Confirm holding up drywall 5/8" from floor substrate

  • Confirm correct wall insulation is installed where required

  • Confirm joints are butted per plans and specs

  • Confirm C.J. are installed per plans and specs

  • Confirm vertical board joints are staggered 1-stud bay minimum at both sides of rated walls

  • Confirm installation of sound caulk, if applicable, from bottom of drywall to floor substrate and top of drywall to deck stubstrate

  • Confirm cleanup of our cartons and scrap material

  • Inspect and walk the site with G.C. Superintendent

Shaftwall Drywall

  • Confirm for updated drawings, RFI's, plans & specs

  • Confirm MEP in riser shaft are inspected and signed off

  • Confirm fire damper framing is installed per manufacturer's data

  • Confirm studs, drywall and shaftliner material is per plans and specs

  • Confirm liner panel joints are staggered per plans and specs

  • Confirm top of liner panel is 1" below top track

  • Confirm shaftwall liners are screwed to J-runner per plans and specs

  • Confirm mineral wool is installed on top of shaftliner panels for firestopping spray (where applicable)

  • Confirm firestopping spray is a minimal 1/8" thick

  • Inspect and walk the site with G.C. Superintendent

  • Confirm cleanup of our cartons and scrap materials

Completion

  • Comments

  • HL QC Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.