Title Page
-
HL Job Number
-
Job Site Name
-
Conducted on
-
HL QAQC Inspector
-
Job Site Area of QAQC Inspection
Interior Drywall - Checklist
-
I.D.I. QAQC Inspector
Prior to One-Side
-
Confirm for updated drawings, RFI's, plans & specs
-
Confirm MEP's are not protruding beyond stud plane
-
Confirm MEP strapping not bulging beyond stud plane
-
Confirm all framing, backing and H.M. frames have not been damaged
-
Confirm framing and MEP installation is complete prior to close-up
-
Confirm framing and backing QC forms are signed-off
-
One-Side
-
Confirm HM frames are plumb
-
Confirm correct fasteners are spaced per plans and specs
-
Confirm holding up drywall 5/8" from floor substrate
-
Confirm joints are butted per plans and specs
-
Confirm C.J. are installed per plans and specs
-
Confirm installation of sound caulk, if applicable, from bottom of drywall to floor substrate and top of drywall to deck substrate
-
Second-Side
-
Confirm track cavities are cleaned
-
Confirm holding up drywall 5/8" from floor substrate
-
Confirm correct wall insulation is installed where required
-
Confirm joints are butted per plans and specs
-
Confirm C.J. are installed per plans and specs
-
Confirm vertical board joints are staggered 1-stud bay minimum at both sides of rated walls
-
Confirm installation of sound caulk, if applicable, from bottom of drywall to floor substrate and top of drywall to deck stubstrate
-
Confirm cleanup of our cartons and scrap material
-
Inspect and walk the site with G.C. Superintendent
-
Shaftwall Drywall
-
Confirm for updated drawings, RFI's, plans & specs
-
Confirm MEP in riser shaft are inspected and signed off
-
Confirm fire damper framing is installed per manufacturer's data
-
Confirm studs, drywall and shaftliner material is per plans and specs
-
Confirm liner panel joints are staggered per plans and specs
-
Confirm top of liner panel is 1" below top track
-
Confirm shaftwall liners are screwed to J-runner per plans and specs
-
Confirm mineral wool is installed on top of shaftliner panels for firestopping spray (where applicable)
-
Confirm firestopping spray is a minimal 1/8" thick
-
Inspect and walk the site with G.C. Superintendent
-
Confirm cleanup of our cartons and scrap materials
Completion
-
Comments
-
HL QC Inspector