Drywall Finishing - Checklist
-
Confirm for updated drawings, RFI's, plans & specs
-
Confirm all rooms are clear of other subcontactor's materials and equipment during taping
-
Confirm beads are plumb and in plane with the wall prior to taping
-
Confirm minimum 50 degrees F temperature maintained in building
-
Confirm cornerbeads and 093 control joints are floated at the ceiling and floors, to minimize gaps at the ceiling grid and base
-
Confirm wall is finished to floor at roll-up flooring and exposed floors with no base
-
Check around door and window jambs to make certain there are no chatter marks and that the walls and frames are cleared of mud
-
Confirm skim coat on walls is checked out and sanded. Check with lights prior to primer where level 5 finish is applicable
-
Confirm all electrical boxes, etc., are clean of taping mud
-
Confirm door/window frames are cleaned of excess mud
-
Confirm any patches have been floated out
-
Confirm cleanup of our cartons and scrap materials
-
Inspect and walk the site with G.C. Superintendent