Information
-
Department
-
Conducted on
-
Prepared by
Personal Protective Equipment
Personal Protective Equipment (Subpart I - 1910.132)
-
Hard Hats - being worn & in good condition
-
Shoes - Condition (e.g. steel toe exposed < 1", laced up & stitching)
-
Safety Glasses/Double Eye Protection (When necessary)
-
Work Clothes - Condition (e.g. rips, tears, holes, etc.)
-
Gloves - Right for the for the job & condition (e.g. holes, stitching)
-
Hearing Protection - Worn correctly
-
Fall protection in use (At or over 4ft.)
-
Proper storage (Respirators, face shields)
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Hazard Communication
Hazard Communication (Subpart Z - 1910.1200)
-
GHS/HMIS Labels - Correct & Legible
-
Chemical Drum - Storage, containment, lids & caps in place
-
No open containers around food/drinks
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Electrical
Electrical (Subpart S - 1910.301)
-
Electric cords (e.g. plug and insulation damage)
-
Correct labeling on inside of electrical panel box
-
3 foot clearance for panel access<br>
-
Panel doors are closed
-
Receptacle condition
-
GFCI Receptacle condition - test
-
Lockout/Tagout - installed and used properly (when necessary)
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Fire Prevention
Fire Prevention (Subpart L - 1910.155)
-
Flammable materials within 3 ft. of storage cabinets (paint, solvents, etc.)
-
Open Containers (Paint cans/thinner cans)
-
Fire extinguishers (minimum 3 ft. access, missing, insp tag signed, charged)
-
No painting within 25 ft. of electrical boxes
-
Flammable Storage Cabinets grounded
-
Exit doors and No Exit (marked, accessible and functioning)
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
HouseKeeping
Housekeeping (Subpart D - 1910.22)
-
Recycle Waste & Scrap bins are labeled, used, & not overfilled.
-
Combustible materials removed (rags, paper, cardboard)
-
Clear walkways and clean floors (blocks, lines, equipment)
-
Clear access area to fixed ladders
-
Eye wash stations are accessible
-
Changes in floor elevation are identified
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Ladders
-
Ladders (Subpart D - 1910.23)
-
Safety labels are legible
-
Correct height for the job & stored properly
-
Damaged steps/side rails/hinge spreaders
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Compressed Air Equipment
-
Compressed Air Equipment (Subpart M - 1910.169)
-
Splice distance from working end (25 ft. min)
-
Leaks/damage to lines/connections
-
Open/uncapped lines/hoses
-
Access to Emergency Shut Off & marked clearly
-
Air guns used w/safety nozzle/tip and labeled correctly
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Gas/Oxygen Equipment
-
Gas/Oxygen Equipment (Subpart H - 1910.101)
-
Cylinder Use & Storage ( Right Location & Secured)
-
Double eye protection (face shield tinted/clear with mag strip)
-
Regulators - Lens condition/missing <br>
-
Torches (heating/cutting, bent tubes, tip condition, control valves)
-
Open/uncapped hoses <br>
-
Splice distance from connection fuel/O2 min. 10 ft. <br>
-
Leaks/damages to lines/hoses
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Welding
-
Welding
-
Cylinder use and storage (Correct location and secured)
-
Regulators - lens condition/missing
-
Use of arc shielding
-
Double eye protection (weld/face shield tinted/clear with mag strip)
-
Welding cables (bare/exposed cables)
-
Insulator covers (welding/air arc rod holder)
-
Ground clamps (condition/connection)
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Grinding/Air Tools
-
Grinding/Air Tools (Subpart O - 1910.215)
-
Guards & Safety Latch <br>
-
Quick disconnect - Leaking/Loose <br>
-
Disc/Stone wheel condition cracked/chipped <br>
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Hand & Power Tools
Hand & Power Tools (Subpart P - 1910.241)
-
Bench Grinder - guards are in place with appropriate gaps
-
C-clamps - Bent/ missing foot pad <br>
-
Comalongs - Cracked casings, handle condition <br>
-
Disc Grinders are in place
-
Drill Press - Chip Guard - Maint/Weld Shop/Mold Shop
-
Fitting rams (cracks, splits, mushroomed ends) <br>
-
Floor Sanders
-
Hammers -defects or damage (e.g., mushroomed, chips, cracks, etc.) to the heads and handles. <br>
-
Hammer & Hilti gun
-
Hydraulics (stress jack)
-
Hydraulics (Enerpac jack, leaks, loose collars) <br>
-
Iron Press & Spartan - Weld Shop Only
-
Saws (hand & table)
-
Stencils/ID stamps dressed, (no chips, cracks, or mushroomed) <br>
-
Unsecured Drills <br>
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Cranes & Material Handling
-
Cranes and Material Handling (Subpart N - 1910.176 & 1910.179)
-
Crane Log filled out completely (no blank boxes)
-
Stacking/Blocking of materials <br>
-
Girders/Panels secured
-
Capacity information in place and readable <br>
-
Condition of wood blocks
-
Nylon/Wire Mesh slings and belts <br>
-
Safety ropes in place (Boom Cranes)
-
Wheel Guards - MiJacks
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
PITs
-
PITs (Subpart N - 1910.178)
-
Daily Inspection Logs accurate <br>
-
Seat Belts being worn <br>
-
Fire Extinguisher inspected monthly <br>
-
Back up alarms/mirrors clean, free of cracks <br>
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Confined Space
-
Confined Spaces (Subpart J - 1910.146)
-
Identified & Signs in place <br>
-
Permit posted <br>
-
Ventilation in place <br>
-
Sign in Sign out sheet <br>
-
Air Quality Readings Recorded per hour <br>
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Environmental
-
Environmental (Subpart J - 1910.141)
-
Waste Containers are labeled - both inside and outside trash containers (i.e. wood, metal, etc.)
-
Drip Pans are under Totes
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Forms/Bed
-
Forms/Bed
-
Chains in place
-
Stressing alarm/signs/warning lights
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Coating/Blasting
-
Coating/Blasting
-
Paint/Solvent (storage, proper containers, grounded, doors closed, clear access) <br>
-
Respiratory Protection in use <br>
-
CO monitor Inspections accurate - weekly<br>
-
CO monitor filter change date - recorded
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Trailers
-
Trailers
-
Binder Condition (Bent hook/handle, damaged threads, oiled)<br>
-
Chains (visible damage)<br>
-
Floor boards (Missing/Broken)<br>
-
Timbers (End fungus, split, crushed)<br>
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
X-Ray
-
X-Ray (Subpart Z - 1910.1096)
-
Signs & safety barriers in place<br>
-
Dosimeters & film badges in use<br>
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Machine Centers
-
Machine Centers
-
Lockout/Tagout<br>
-
Leaks or Spills<br>
-
Work Stations/Access<br>
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
Other Safety Violations
-
Other Safety Violations
-
-
-
-
-
-
-
-
-
-
Corrections:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action:
-
At Risk Item: <br>Completion Date: <br>Corrective Action: