Information
-
Client
-
Contract Name
-
Plot No(s)
-
House Types(s)
-
FFL(s)
-
Foundation Type
-
Conducted on
-
Prepared by
Site Strip
-
Top Soil Strip? (mm)
-
Reduce level dig? (mm)
Foundation
-
Floor Type
-
Sketch of foundation or specific detail as required
-
Proposed foundation dig level (mm)
-
Actual foundation dig level (mm)
-
Proposed concrete depth (mm)
-
Actual concrete depth (mm)
-
Proposed under build depth (mm)
-
Actual under build depth (mm)
Concrete Used
-
Proposed Total Concrete Used (Cube)
-
Actual Total Concrete Used (Cube)
-
Extra Depth (mm)
-
Actual FFL
Declarations
-
The information above is correct to the best of my knowledge.
-
Clients Site Representative
-
M Lambe Site Representative