Title Page

  • Site conducted

  • Conducted on

  • Location
  • Prepared by

  • To be carried out by a manager every 3 months

  • Take photos to record non conformances and to show conforming items

    Racking Inspection
  • Racking ID/location:

  • Floor footplates and bolts intact and concrete sound? (+/- column guards)

  • Framework uprights undamaged? –eg. no impact damage/bending/corrosion affecting rigidity or load bearing

  • Framework diagonal bracing beams undamaged? –eg. no impact damage/bending/corrosion affecting rigidity or load bearing

  • Framework horizontal bracing beams undamaged? –eg. no impact damage/bending/corrosion affecting rigidity or load bearing

  • Framework beam locks secure?

  • Pallet holding beams/mechanism sound +/- operating smoothly?

  • Load notices in place (UDL or SWL)?

  • Racking used as intended?

Signature

  • Signed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.