Title Page
-
I.D.I. Job Number
-
Job Site Name
-
Conducted on
-
I.D.I. QAQC Inspector
-
Job Site Area of QAQC Inspection
-
Confirm for updated drawings, RFI's, plans & specs
-
Confirm MEP in riser shaft are inspected and signed off
-
Confirm fire damper framing is installed per manufacturer's data
-
Confirm studs, drywall and shaftliner material is per plans and specs
-
Confirm bottom track is attached per plans and specs
-
Confirm liner panel joints are staggered per plans and specs
-
Confirm top of liner panel is 1" below top track
-
Confirm shaftwall liners are screwed to J-runner per plans and specs
-
Confirm mineral wool is installed on top of shaftliner panels for firestopping spray (where applicable)
-
Confirm firestopping spray is a minimal 1/8" thick
-
Confirm cleanup of our cartons and scrap materials
-
Inspect and walk the site with G.C. Superintendent
-
Comments
-
Sign Off
-
I.D.I. QAQC Inspector