  • I.D.I. Job Number

  • Job Site Name

  • Conducted on

  • I.D.I. QAQC Inspector

  • Job Site Area of QAQC Inspection

  • Confirm for updated drawings, plans & specs

  • Have all shop drawings and truss drawings been approved?

  • Are we using a spreader bar to install trusses?

  • Are all trusses free of damage from shipping?

  • Are we installing the correct number of fasteners into the truss?

  • Are we installing the correct number of fasteners into the bearing point?

  • Have you verified that the fasteners have not been over tightened or stripped?

  • Are all fasteners installed in the correct holes of the clips?

  • Has all X bracing been installed correctly with a maximum of 20’ in-between the braces?

  • Has all bracing been installed 100% at the end of the day?

  • Has lateral load bracing been installed?

  • Are the trusses plumb and level after the bracing has been installed?

  • Have the jack trusses been installed to the girder truss correctly?

  • Has all bracing been checked before the installation of the sheathing?

  • Confirm clean-up of our material and scrap?

  • Did you walk the job site with the GC?

  • Comments

  • Sign Off

  • I.D.I. QAQC Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.