Title Page
-
S Refrence
-
Site conducted
-
Conducted on Date
-
Prepared by
-
Location
-
Installer Partner engineers name (NOT YOUR NAME)
-
Please acknowledge you can only raise this form if its a genuine install partner error. If the original task failed due to network issues / build issues or has had a contractor repair faulty network after the initial visit you are not required to fill in this form.
Task Details
-
Task Type
- Pre DPA Blockage
- Pre CF Blockage
- DPA Blockage
- CF Blockage
- Light Fault
- ERS / Customer Fault
Blown Fibre
-
Were you required to use your blowing kit
-
Please confirm equipment used
- Lastmile 10 bar compressor
- 10m 16 Bar hose
- Hexatronic Handheld blowing gun
- Hexatronic Duct integrity kit
-
Was the BFT Blocked on Arrival.
-
Tests preformed
-
Why did the test fail. Select all that applies
- Bullets stuck
- sponge stuck
- fibre stuck
- connector issue
- brown bft issue
- other
-
Did you successfully install a fibre from SN to wall box
-
Were you required to blow from the Toby due to Brown BFT issues
-
Were you required to reverse blow from SN towards wallbox
-
Were you required to cut the end off the fibre for a successful install
DPA Rodding
-
Were you required to use Cobras on this task
-
Select the equipment used
- 9mm Cobra rod
- 6mm Cobra Rod
- Spring end
- 40mm ball end
- Bullet end
- 60cm Flexi tip
-
Was the chamber obstructed or hidden from plain sight
-
Did you have to dig or expose the duct as it was hidden
-
Did you have to break / remove concrete or slabs etc at the duct mouth
-
Did you have to hoover debris from within the duct
ERS / Customer Fault
-
Was this a Customer Fault
-
What was the fault
-
What was the cause of the fault
-
What was required to resolve the fault and restore service
Light Issues
-
Was this a light related issue
-
Please give a detailed account of the issue and the fix
Summary
-
Total time resolving the actual issue in minuets. DO NOT PUT ZERO. DO NOT PUT TOTAL TIME ON SITE.
-
Supporting Photos
-
Detailed summary of works - DO NOT PUT SEE NOTES