Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Process Compliance
-
Are the H&S / Technical Bulletin boards up to Date?
-
Are the Fitters being taken through the H&S / Technical Information routinely?
-
Are the customer Ancillary packs being checked against Survey pre-fit?
-
Are the unused products being routinely sent back to PCW?
-
Are the stillages from the factory arriving to the correct standard?
-
Are Glazing consumables being managed on a first in first out basis?
-
Are the stillages that are being sent back to PCW to the correct standard?
-
If no then has this being rectified prior to leaving the depot
Product Storage
-
Are all glass stored in the correct locations and not on the floor? (i.e on stillages or racking/timber boarding)
- Yes
- No
-
Are all PVC part item Remakes stored with foam corner protectors attached?
-
Are products correctly separated, with the relevant Demarcation?
-
Are Depot Ancillary Stocks in place?
-
Are products being stored upright to prevent damage and distortion?
-
Are the Cills stored correctly to prevent Damage?
Product Compliance
-
Are the Fitters using correx to separate product on the vans to stop SMD?
-
Are the PVC Welds to the required Standard?
-
Are the PVC products free from Scratches, Marks and Damages on Delivery from the Manufacture plant?
-
Are all foiled products delivered from the Factory separated with either cardboard or correx?
-
Are the PVC products Reinforced where required?
-
Are locks & hardware correctly aligned on the PVC products?
-
Are the glass units free from Scratches, Marks and Damage?