Title Page
-
Site conducted
-
Engineer Name
-
Conducted on
-
Location
-
Customer Number
-
Works Completed?
Completion Evidence Report
Permits
-
Is this OH or UG?
-
Is this Fault or AC?
-
Number of spans from MST/CBT
-
External Wall Box?
-
Assist/hoist? Please type Hoist/Assist/None
-
Is this Fault or AC?
-
Has the permit to dig & POWRA been completed for works?
-
Is the excavation in public under a permit or in private?
-
Has the permit been started and closed?
-
Surface type (Select all that apply)
- C/W
- F/W
- Tarmac
- Concrete
- Pavers
- Slabs
- Soft
-
Measurements of dig
-
External Wall Box
undefined
-
Light test reading at MST completed (Include pictures)
-
Light test reading completed on Cable (Include pictures)
-
Length of cable consumed (Include pictures)
- 35m (OH)
- 50m
- 65m (OH)
- 100m
- 105m (OH)
- 150m
- 160m (OH)
- 200m
- 250m
- 300m
- 350m
- 400m
- 450m
- 500m
- N/A
-
Length of cable actually needed
-
Internal/External Cable Consumed
- 5m
- 10m
- 20m
- 30m
- 50m
- N/A
-
Internal/External Cable actually used
Internal Works
-
Length of internal cable consumed
- 1.5m
- 3m
- 5m
- 10m
- 15m
- 20m
- 25m
- 50m
- N/A
-
Actual length of internal cable used
-
Beacons?
-
How many beacons?
-
Speed Test Results
-
Number of devices connected
-
Number of speed tests internally
-
Duration of works (HH:MM)
-
Any additional information?