Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
This checklist is to be completed in conjunction with the maintenance activities outlined in the Romi maintenance manual. This checklist is to be signed and dated and stored as a record of maintenance activities having been conducted.
-
Bench
-
Levelling
-
Procedure
-
Headstock
-
Position encoder
-
Lubrication
-
Alignment
-
Checking Alignment using machined rod
-
Headstock lifting and transporting
-
Moveable Headstock
-
Lubrication
-
Alignment
-
Align using machined rod
-
Access to movable headstock
-
Table and Transversal Support
-
Table operation (z axle)
-
Transversal support operation (X Axle)
-
Guides
-
Conic rule setting
-
Reference point supports
-
Motorisation
-
Automatic lubrication periodic maintenance
-
Guides and spindle lubrication
-
Movable headstock and pneumatic plates
-
Pneumatic movable headstock
-
Pneumatic plate with incorporated cylinder
-
Hydraulic System (assessory)
-
Periodic Maintenance
-
Periodic Maintenance - Heat exchangers
-
Plate and removable headstock hydraulic unit
-
Hydraulic Diagram
-
Electric diagram hydraulic unit
-
Remove able chip collector container
-
Chip conveyer
-
Cooling system and chip conveyor connectors
-
System supply
-
Abnormal heating and heating
-
Chip wipers
-
Lighting fixtures
-
Door viewer (polycarbonate cleaning procedures )
-
Air conditioning for electric panel (where fitted)
-
Oil separator /skimmer (where fitted)
-
Horizontal electric tower (where fitted)
-
Safety electrical lock
-
RS232 connection and electrical power outlet
-
Electrical panel -ventilation area
-
Select date
-
Person conducting maintenance to sign