Primary LED Module Inspection
-
The objective of this inspection process is to identify faulty LED modules, noting below any necessary details, and the steps taken to correct the issues.
-
Red LED Inspection
-
Green LED Inspection
-
Blue LED Inspection
-
Notes: ____________________________________________________________________________________ ___________________________________________________________________________________________
Color Uniformity
-
The objective of this inspection process is to identify non-uniform color and/or intensity across all LED's, while rotating through each color, and illuminating them simultaneously.
-
Red LED Inspection
-
Green LED Inspection
-
Blue LED Inspection
-
White LED Inspection
-
Notes: ____________________________________________________________________________________ ___________________________________________________________________________________________
Video Test
-
While generating a vertical sweep pattern, verify there are no timing differences between LED panels.
-
While generating a vertical sweep pattern, verify there are no timing differences between LED groups.
-
While generating a horizontal sweep pattern, verify there are no timing differences between LED panels.
-
While generating a horizontal sweep pattern, verify there are no timing differences between LED groups.
-
Verify the backup feed to each LED group is operational by pulling the primary data cable to each LED group and visually confirming signal is present.
-
While in back-up mode, restore video to half of the LED groups and verify there are no timing differences in the video file.
-
If the LED panel uses magnetic module attachment and alignment, ensure the front face of the LED panel is flush module to module, and that there are no height differences.<br>If a difference occurs, check the rear magnets for foreign objects that may be stuck and causing the offset.
-
Notes: ____________________________________________________________________________________ ___________________________________________________________________________________________
Labeling & Mounting
-
Using the LED panel overlay, ensure each panel is properly labeled and segmented.
-
Verify masking around each corner of the LED panel is not damaged, or "bubbling".
-
Verify all connection points are secure.
-
Using a flashlight, from the back-side of the panel, verify all seams between panels are uniform (little to no light should be visible from the front side).
-
Notes: ____________________________________________________________________________________ ___________________________________________________________________________________________
Documentation
-
A manufacturer provided copy of the receiving card configuration file (Novastar .rcfg file) has been included, and will remain with provided spares at all times.
Additionally, a Technomedia provided copy of the system configuration file and screen connection files have been saved to disk and stored with spare parts (Novastar .scfg and .scr files). -
While sending media to the LED monitors, capture with video the displayed image.
Spares
-
All on site spares are to be organized and stored in a suitable road case or pelican style case, and an inventory list included.
-