Information
-
Document No.
-
Audit Title
-
Conducted on
-
Log Yard Area:
- FML
- PFO
- LFL
-
Date of last vessel load out:
-
Date of next load out:
-
What is happening in yard?
- Loading out
- Loading in
- Storage
-
How much of yard storage are filled with logs?
- Full
- Half Full
- Less than Quarter Full
- Three-quarters full
Bark Debris
-
Is there bark debris on access roadway?
-
Is the bark debris breaking down and forming dust?
-
Is there bark debris between the rows?
-
Is bark debris accumulating against the concrete barriers?
-
Are there bark debris piles on site?
-
Is there bark debris covering the stormwater grates ?
-
Is there bark debris in stormwater channel?
-
Is there any ponding around the stormwater grates?
Further Actions
-
Are there there any follow up action required?
-
Describe follow up actions needed:
-
To be completed by what date?
-
Who is responsible for follow up actions ?
- C3
- Port Services
- Civil Maintenance
- Environment
- PFO
- FML
- LFL
-
Inspection By
-
Signature
-
Inspection sheet emailed to the following:
- Tony S
- Brigid C
- Kim K