Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Region
-
Contractor/s
-
Audit Date
-
Time
-
LIS No.
-
Equipment No.
-
Notification No.
-
Order No.
-
Date of works completed in the field.
-
Construction Type
- Intermediate
- Strain
- Anchor
- Tee
- Two way Tee
- Termination
-
Voltage(s)
1. LV Crossarm
-
Are cross arm level and size correct?
-
Have phase plates been fitted?
-
Has a N plate been fitted?
-
Have conductor clearances been maintained?
-
Are bridges neat and tidy?
-
Are conductors tied in and secured appropriately?
-
Has the public light been fitted appropriately?
-
Are assets built to approved drawing's?
-
Have LV insulators been changed?
-
Are service tails or pole box leads adequately supported by under arm brackets?
-
Has the switchwire been removed?
-
If the switchwire has been removed has the remaining conductor been terminated correctly.
2. Services
-
Have all non standard services been changed as per opportunistic maintenance guidelines?
-
Are service heights compliant to requirements?
-
Do services have "N" tags ?
-
Are services terminated to standard requirements?
3. Hardware
-
Have line and PG clamps been replaced with Ampact connections where applicable?
-
Have all obsolete service clamps been removed from conductor?
-
Have obsolete or unapproved pole boxes been removed?
-
Are the newly installed materials approved?
4. Worksite
-
Has the worksite been left in a clean and tidy state?
5. SAP Claims
-
Does the SAP claim match the works conducted on site?
-
Does the service provider claims math the claims in UE sap?
-
Comments
-
Overall Audit Rating
- 1
- 1.5
- 2
- 2.5
- 3
- 3.5
- 4
- 4.5
- 5
- 5.5
- 6
- 6.5
- 7
- 7.5
- 8
- 8.5
- 9
- 9.5
- 10