Title Page
-
Job No.
-
Job Description
-
Client
-
Conducted on
-
Prepared by
-
Location
-
Personnel
01 Work in Progress
-
1. Are all major material sections/components marked with the relevant job number?
-
2. Are the welding machines in use calibrated and labelled with calibration dates?
-
3. Are the welding activities being undertaken in accordance with an approved WPQR/WPS?
-
4. Does the welder(s) know which WPQR/WPS relates to the work in progress?
-
5. Are the welder(s) appropriately qualified for welding process, position, materials and thicknesses involved?
-
6. Are joint fit-ups and preparations in accordance with the relevant WPS?
-
7. Are weld maps and/or welding databooks being completed?
-
Observations:
02 Material Control
-
1. Are conforming and non-conforming materials appropriately separated?
-
2. Are conforming and non-conforming materials appropriately labelled e.g. job no. or green paint mark?
-
3. Are metal types appropriately separated e.g. steel and aluminium?
-
Observations:
03 Stores Control
-
1. Are welding consumables stored correctly e.g. temperature controlled environment?
-
2. Is there evidence of ‘first in first out’ (FIFO) methodology being used for welding consumable withdrawal?
-
3. Are all welding consumables within their shelf-life?
-
4. Are non-conforming (non-traceable or expired) welding consumables stored separately and clearly labelled as such?
-
5. Are welding consumable withdrawal logs being completed with job no. traceability?<br>
-
6. Are welding consumable certificates available for stored items?
-
Observations:
04 Overall Observations
-
Key Points:
Sign Off
-
Job Representitive
-
Auditors Signature