1.0 Has the Project been uploaded to the Hub?<br><br>
-
2.0 Have ALL Minimum Requirement (MR) Forms been completed correctly? (check for accuracy and for all signatures)
-
3.0 Have the MR forms been uploaded to the hub / mango MR module?
-
4.0 Have all items from the MR07 Preconstruction Review been closed out? (provide evidence)<br><br>
-
5.0 Has the HIRAC documentation been reviewed and approved (signed) by the Regional HSE Coordinator?<br>
-
6.0 Is there an approved (signed) Project Management Plan (PMP) for this Project?<br><br>
-
6.1 Does the PMP contain the ‘minimum contents’ as detailed on page 101 of the Matrix QA Manual?
-
6.2 Has the PMP been reviewed since it was created prior to the construction phase?<br><br>
-
7.0 Has the WHSMP and CESMP been signed by all required people?
-
8.0 Is the WHSMP and the CESMP templates the latest versions sourced from Mango? (CESMP rev. B and WHSMP Rev. 4 as at September 2012).
-
9.0 Is a Daily Site Diary being maintained with sufficient detail? (sight several daily diaries as evidence)
-
10.0 Are all Matrix-initiated ‘Requests for Information’ RFI’s generated by Prolog / Muli / Viewpoint ?
-
10.1 If not, how are they issued? Has this procedure been documented within the PMP?
-
11.0 Has a Dilapidation Report been prepared for the Project? (must include photos and a descriptive written record).
-
11.1 Do all images included in the Dilapidation report include a date that the photo was taken?
-
11.2 Has the Dilapidation report been sent to the client? (provide evidence)<br>
-
12.0 Is the project holding regular Site Client Meetings? (provide evidence)<br><br>
-
12.1 Are minutes of the site client meetings taken and distributed to the client?
-
13.0 Is the project holding regular subcontractor meetings?<br>
-
13.1 Are the minutes of the subcontractor meetings being taken and distributed to subcontractors? (provide evidence)
-
14.0 Is the project holding regular team meetings?<br>
-
14.1 Are the minutes of the team meetings being taken and distributed to the team?
-
15.0 Is the contract program being statused weekly?
-
15.1 Does the contract & target program include the following items (as a minimum)<br>
-
15.1.1 Overall Project Milestones<br>
-
15.1.2. Design Activities
-
15.1.3 Procurement Activities
-
15.1.4 Lead Time Items
-
15.1.5 Construction Activities
-
15.1.6 Finalization Activities
-
15.1.7 Is the statused Contract and Target Program included in the Monthly Project Review? (provide evidence)
-
16.0 Are all design documentation date-stamped on receipt and recorded in the appropriate register in Prolog / Muli / Viewpoint?
-
16.1 Are all design documentation distributed to the relevant persons by use of the FTP/Email/Hardcopy? (information such as the person to whom the documents are being transmitted, date when transmitted, project, document title, revision date and number shall be noted).
-
17.0 Has a register for Samples and Submittals been established?<br>
-
18.0 If there are any client supplied products for the project, has a register been established to keep track of these products?
-
19.0 Do all tools and equipment that are used for measuring or testing (e.g. Noise Measuring devices, Gas Detection devices and Air Quality monitors) have a current calibration certificate? (provide evidence, such as a calibration certification register).
-
20.0 Are all Site Instructions issued from Prolog?
-
20.1 Has a site instruction register been established and maintained?<br>
-
21.0 Are progress photos being taken of the project? (ensure all photos are dates and have a description attached).
-
22.0 Has proformas for the notification of Delay and claims for EOT been prepared?
-
22.1 Has a ‘Delays and EOT’ Register been established?
-
23.0 As a minimum, as the project established controls and registers for the following: (the project controls shall provide a record of the expected scope and expenditure for the controlled project elements)
-
23.1 Concrete Control
-
23.2 Reinforcement Control
-
23.3 Scaffold Control
-
23.4 Cranage Control
-
23.5 Contract Labour / Supervision Control
-
23.6 Rubbish Removal<br>
-
24.0 Is the project using Inspection & Test Plans? (ITP’s) – (list all ITP’s being used)<br>
-
24.1 Have all ITP’s been completed and approved correctly (all areas that require signing etc)<br>
-
24.2 Are the ITPs that are being used, the same ones that are documented within the PMP?
-
24.3 Has an ITP register been established?<br>
-
25.0 Has a site-specific induction been developed for this project? (check site induction records for accuracy)<br>
-
26.0 Is the site team performing daily EHS Inspections?<br>
-
26.1 Is the data from the daily EHS inspecting being recorded no less than weekly within a Form 06 EHS Inspection Checklist? (check records)
-
27.0 Does the site have an emergency plan, including Evacuation procedures? (provide evidence)<br>
-
27.1 Are evacuation diagrams displayed on site? (site office, first aid shed, lunch rooms)
Sign Off
-
Name & Site Role of Matrix person conducting Audit
-
Add signature
Additional Comments by Matrix Auditor
-
NOTE: Upload events on to Mango if they cannot be closed out on the day of inspection